Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Randolph, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
**As of May 4,2023, project was awarded to Kopplin & Kinas Co Inc., awarded amount is $1,801,552.15.** The work for which bids are asked includes the following estimated quantities: 2,200 LF of sanitary sewer and laterals (8-inch PVC) along with associated sanitary sewer work and laterals; 2,300 L.F. of water main (6-inch thru 8-inch PVC) and associated water work and services; 220 LF of storm sewer (19-inch x 30-inch HERCP) and associated storm structure work; 9,500 S.Y. aggregate base and geogrid installation; 7,900 S.Y. topsoil and seeding; 8,500 S.Y. of asphalt pavement; 3,700 L.F. concrete curb and gutter; 4,100 S.F. of concrete sidewalk; 2,000 S.F. concrete driveway approach; as well as all related work including unclassified excavation, erosion control, and traffic control. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. Pursuant to Section 66.0903, Wisconsin Statutes, the minimum wages to be paid on the project shall be in accordance with the wage rate scale established by Federal wage rates. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Federal wage rates can be found online. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. This project anticipates the use of Community Development Block Grant (CDBG) Funding. Attention of Bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. This project anticipates use of Wisconsin DNR Safe Drinking Water Loan Program AND/OR Clean Water Fund Program funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the "Use of American Iron and Steel" provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. EPA guidance for the use of American Iron and Steel (AIS) can be found at http://water.epa.gov/grants_funding/aisrequirement.cfm . OWNER reserves the right to waive any informalities or to reject any or all bids. Questions received less than ten days prior to the date for opening of Bids may not be answered. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.
Award
Sidewalks / Parking Lot
$1,801,552.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 11, 2023
July 1, 2023
To Be Determined, Randolph, WI
Related To This Project
Randolph, WI
Bid Date: Sep 06 2023
Randolph, WI
--
Randolph, WI
Bid Date: Dec 16 2021
Randolph, WI
Bid Date: Dec 14 2023
Randolph, WI
Bid Date: Aug 08 2024
Randolph, WI
Bid Date: Aug 15 2024
Randolph, WI
--
Randolph, WI
Bid Date: Feb 25 2020
Randolph, WI
Bid Date: Apr 24 2020
Kenosha, WI
Bid Date: Apr 18 2023
Rosholt, WI
Bid Date: Apr 18 2023
Black River Falls, WI
Bid Date: Jun 20 2023
Little Chute, WI
Bid Date: May 10 2023
Eau Claire, WI
Bid Date: Apr 11 2023
Ashland, WI
Bid Date: Apr 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.