BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Canton, Ohio. Conceptual plans call for site work for a water / sewer project.

This project is located along the following streets: o Fairmount Ave NE from Fletcher to Kirby o 29th St. NE from Fletcher to Kirby o Fletcher Ave NE from 27th to 30th o Gilbert Ave NE from Fairmount to 30th o Ellis Ave NE from Fairmount to 29th o Kirby Ave NE from Mahoning to 30th It will involve extension of approximately 8,805 LF of 6" waterline and 1,625 LF of 8" waterline along with the installation of valves, hydrants, and reconnection to the existing water distribution network. Construction is estimated to begin August of 2023 with a project duration of approximately 33 weeksThe professional services needed under this request for qualifications are construction management and inspection. This includes, but is not limited to, inspection of material, ensure construction is according to plan, review/manage project documentation, quality assurance testing, measure/track quantities, prepare/review pay estimates and change orders, and preparing as-built drawings. This project is located along the following streets: o 34th St. NW from Harrison Ave NW to Shanabruck Ave NW o Washington Blvd NW from Culver Drive NW to Shanabruck Ave NW o Culver Drive NW from Washington Blvd NW to 34th St. NW o Harrison Ave NW from 34th St. NW to Franklin St. NWEllis Ave NE from Fairmount to 29th It will involve extension of approximately 7,120 LF of 6" waterline and 1,220 LF of 8" waterline along with the installation of valves, hydrants, and reconnection to the existing water distribution network. Construction is estimated to begin August of 2023 w Please direct all questions regarding this request for qualifications in writing by Wednesday, April 19, 2023 at 4:00 PM to: Andrew Roth, Director of Purchasing purchasing@cantonohio.gov Responding firms will be evaluated and ranked pursuant to Ohio Revised Code Sections 153.65-153.73 based on the above criteria. The City will then commence fee and contract negotiations with the selected firm most qualified to perform the services for the project described above. The final scope of construction oversight services will also be established during these negotiations. The City of Canton reserves the right to reject any and all proposals and to accept the proposal deemed most beneficial to the City of Canton. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

$3,020,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
66
Bidding Soon
1,166
All Active Projects
452
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2023

img_map_placeholder

Multiple Locations, Canton, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.