BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2024 at 7:00 PM

Updated February 27, 2024

Renovation of a warehouse / distribution facility in Winnipeg, Manitoba. Design plans call for the renovation of a warehouse / distribution facility.

Construction of a Solar Photovoltaic (PV) Microgrid and Energy Management System. Grid-tied microgrid consisting of minimum 1.07MW energy generation from a rooftop solar PV installation, existing 0.18MW diesel genset. TIMELINE: Preliminary design & cost analysis is being completed by Stantec. Once the cost estimate is complete, funding will be sought to proceed with detailed design. A subsequent RFP will be issued for detailed design, the owner does not have an estimated date at this time. Updates may be available late summer 2024.

Design

Warehouse / Distribution

$200,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
43
Bidding Soon
546
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

Project location map

600 Brandon Ave, Winnipeg, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.