BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Lenexa, Kansas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

2023 Sidewalk Repair & Improvement Program - Lenexa, KS Direct all questions to Project Manager: Kyle Rodenhouse, Phone: 913.477.7806, Email: krodenhouse@lenexa.com COMPLETION DATES: The calendar completion date for this project is September 30, 2023. Failure to meet the above dates shall initiate liquidated damages as set forth in General Condition GC-33 Liquidated Damages. SC-2 All work, including clean-up work and restoration, shall be completed before moving on to work in another subdivision. SC-3 The Engineer shall mark out all necessary sidewalk repairs throughout the project location. Repairs will be as needed, and the Contractor should anticipate several sidewalk spot repairs throughout the project area. SC-4 Damage to sprinkler heads, lines, and systems shall be repaired before placement of new concrete or within two weeks of being identified, including the two-year maintenance period. Contractor shall be responsible for any sprinkler reimbursement that occurs from construction activity. SC-5 Restoration of parkway/lawn areas (including sprinkler systems) and all other areas abutting the construction shall be subsidiary to other items in the project. Contractor will also be responsible for repair or reconstruction of any utilities cut or damaged during construction. Restored parkway/lawn areas shall be sodded unless shown otherwise on the plans. When sprinkler systems are encountered and conflict with the construction, the Contractor shall remove sections of sprinkler systems as necessary to facilitate the construction of the project. The disturbed portion of the sprinkler system shall be capped so the remainder of the system may be operated during the construction period. The Contractor shall replace the removed sections of sprinkler system to existing or better condition after construction has been completed and prior to the installation of the sod. For any City owned sprinkler systems the Contractor shall contact the City Parks and Recreation Department prior to removing any sprinkler system components. SC-6 Disturbed areas adjacent to sidewalk, trails, and curbs less than 6" in width may be seeded in lieu of sodding. Pulverized topsoil, mixture turf type fine leaf fescue and perennial rye grass seed shall be used and subsidiary to other bid items.

Bid Results

Sidewalks / Parking Lot

$219,139.00

Public - City

Paving, Site Work

14

5

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
33
Bidding Soon
721
All Active Projects
284
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2023

May 12, 2023

img_map_placeholder

Multiple Locations, Lenexa, KS

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.