BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Mabton, Washington. Completed plans call for site work for a water / sewer project.

The work consists of furnishing all labor, materials, and equipment necessary for construction of the Drilling of Wells 7 and 8. Work shall include, but not be limited to, the following: File a Start Card with the Department of Ecology; Implement erosion control, environmental protections, develop and implement an SPCC plan, take preconstruction and postconstruction site photos, and perform site preparation needed to perform the work; Drill, develop, inspect, test, and disinfect two potable water supply wells, approximately 155 feet deep with stainless steel screens, sand filter pack, and extended surface seals; Manage and dispose of all waste products (including pump test water) and complete site restoration; File all required construction documentation with the Department of Ecology. The Work shall be substantially complete within 80 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk/Treasurer, City Hall, Mabton, Washington. The Proposals will be publicly opened and read aloud shortly after the time and date stated above. Proposals are to be submitted only on the form provided with the Bid Documents. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "City of Mabton" and in an amount of not less than five percent (5%) of the total Proposal amount. The commencement date for the project will be mutually coordinated with the Contractor prior to issuance of the Notice to Proceed, with the intent that the project may begin anytime prior to August 1, 2023.

Bid Results

Water / Sewer

$453,330.00

Public - City

Site Work

6

14

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
3
Bidding Soon
119
All Active Projects
48
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2023

August 1, 2023

img_map_placeholder

Multiple Locations, Mabton, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.