BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2023 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Canton, Illinois. Contact the soliciting agency for additional information.

City/County - Canton Contract Construction to Include: 101 Cu Yd of Earth Exc Wid; 173 Ton of Agg Base Cse B; 60 Sq Yd of Pcc Base Course 4; 578 Pound of Bit Matls Pr & Tack Ct; 59 Ton of Hma Sc Il-9.5 C N50; 458 Sy Yd of Pcc Pvt 8 Jointed; 201 Sq Ft of Pc Conc Sidewalk 4; 324 Sq Yd of Pavement Rem; 105 Sq Yd of Hma Surf Rem 2; 24 Foot of Comb Curb Gutter Rem; 195 Sq Ft of Sidewalk Rem; 2 Each of Water Valves Adjust; 4 Cu Yd of Class Si Conc Outlet; 20 Foot of Conc Gutter Trans; 13 Foot of of Comb Cc&g Tb6.24; 56 Sq Yd of Hma Surf Rem Var Dp; 243 Foot of Conc Gutter Spl, 48 Sq Yd of Seeding (Complete); 160 Sq Yd of Surf Removal Special and Other Collateral Work as Needed to Complete the Project. Project Location: Cherry Street in the City of Canton Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Pcc Base Course, Sidewalk - 22-00111-00-RP

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
61
Bidding Soon
954
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2023

May 12, 2023

Project location map

E Cherry St, Canton, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.