BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Denver, Colorado. Working plans call for site work for a transportation facility.

Reference Number: 0000315561 The East Colfax BRT Project ("Project") will provide significantly faster, safer, more attractive, and more reliable transit service in the highest ridership bus corridor in the Denver Metropolitan Area. The anticipated capital investment in improved stations, dedicated BRT lanes, and better pedestrian access will specifically address the growing travel demand in the corridor and mitigate the increased congestion and transit travel time delays resulting from that growth. The project will improve transit operations and travel time in the corridor, which will in turn attract new transit riders, reduce traffic congestion, improve air quality, increase multi-modal connectivity, improve safety, and encourage transit-oriented development near stations. The Project is intended to be a corridor-based bus rapid transit system that includes features emulating the service provided by rail fixed guideway. The 9.9-route mile corridor includes 32 improved stations with an average spacing of 0.31-mile and will operate 24 hours a day, 7 days a week. Traffic signals will be upgraded to provide transit signal priority where needed through the Denver segment to reduce transit travel time. The BRT service will replace and consolidate the existing bus Route 15 and bus Route 15L services. The outcome of the project will be an attractive transit service that is competitive with the automobile, will improve access and mobility, and will produce significantly higher transit ridership and total person-trip throughput in the corridor. The CM/GC project delivery method will provide efficient and timely completion of the project in line with community interests. DOTI anticipates the final funding source determinations, and the associated Project budget will be finalized by Q4 2023. Question Acceptance Deadline: 04/18/2023 03:00 PM MDT Questions are submitted online: No Purchase Type Term: 07/01/2023 02:00 AM EDT - 06/30/2027 02:00 AM EDT Question Deadline - April 18, 2023 no later than 3:00 p.m. All questions must be sent to doti.procurement@denvergov.org Contact Information: Katie Ragland DOTI.Procurement@denvergov.org Buyer's Requirements Participation Requirements Disadvantaged Business Enterprise (DBE) General Requirements Bidder Prequalification/Preregistration Required Federally Funded Insurance Required Prevailing Wage Required Bonding Requirements Payment and Performance Bond: 100%

Final Planning

Transportation Terminals

$400,000.00

Public - County

Site Work

1

3

716

7

Subscribe For Documents

108 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
38
Bidding Soon
998
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2023

July 1, 2023

img_map_placeholder

To Be Determined, Denver, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.