Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 22, 2025 at 8:00 PM
Updated May 23, 2025
Site work and paving for a road / highway in Moreno Valley, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The Scope of Work consists of installation of a new backbone conduit and cable along Moreno Beach Drive from Oliver Street to John F. Kennedy Drive. Refer to Attachment B (Approved Electric Design) and Attachment C (General and Technical Provisions). The Contractor shall furnish, to the satisfaction of the Engineer, all labor, materials, tools, equipment, and incidentals, unless otherwise specified, to construct and complete the Work in compliance with the Contract Documents. Install new backbone conduit and cable along Moreno Beach Drive from Oliver Street to John. F Kennedy Drive The Bidder may utilize a cashier's or certified check in lieu of a Bidder's Bond in the amount of ten percent (10%) of the total bid. If a cashier's or certified check is used, it shall be delivered to the City Clerk in a sealed envelope at 14177 Frederick Street, Moreno Valley, CA 92553 prior to the Bid Submission Deadline specified herein. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price LIQUIDATED DAMAGES If the awarded Contractor fails to complete the Work within the Contract Time, City shall assess liquidated damages against Contractor at the daily rate established in the Agreement All questions, technical, commercial, or contractual in nature shall be directed to the Q&A section on the e-Procurement System, OpenGov. No phone calls will be allowed. Contact of City personnel directly regarding this solicitation is prohibited and may be grounds for elimination from the selection process. All questions regarding this solicitation must be submitted through OpenGov no later than Tuesday, May 13, 2025 at 2:00 PM. The Contractor shall complete all preconstruction requirements, ordering of materials, and construction of the Project within the Contract Time of 60 Working Days for the Base Bid only, and up to 60 Working Days for Base Bid plus all Additive Alternate Bids after the date of commencement specified in the Notice to Proceed to Fulfill Preconstruction Requirements issued by the City The City shall award the contract for the Project to the lowest responsive, responsible Bidder as determined by the City from the Base Bid alone. The City reserves the right to reject any or all Bids or to waive any irregularities or informalities in any Bids or in the bidding process SCOPE OF WORK. The Contractor shall perform and provide all materials, tools, equipment, labor, and services necessary to complete the Work described in the Contract Documents, except as otherwise provided in the Plans, Standard Specifications, or City Special Provisions to be the responsibility of others.
Bid Results
Roads / Highways
$1,211,703.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2025
July 21, 2025
Moreno Beach Dr, Moreno Valley, CA
Related To This Project
Moreno Valley, CA
--
Moreno Valley, CA
--
Moreno Valley, CA
--
Moreno Valley, CA
--
Moreno Valley, CA
--
Moreno Valley, CA
Bid Date: Apr 03 2025
Moreno Valley, CA
--
Moreno Valley, CA
--
Moreno Valley, CA
--
Moreno Valley, CA
--
Moreno Valley, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
