BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Troy, Illinois. Working plans call for the renovation of a educational facility.

**As of May 3, 2023, this time Triad is NOT moving forward with this project. Location- 703 US-40 Troy, IL 62294 PROJECT DESCRIPTION - Construction of Life Skills Building including all associated work. Work of this Contract includes coordination of entire work of project, including preparation of general coordination drawings/diagrams/schedules, and control of site utilization; from beginning of activity, through project closeout and warranty periods. Bid Security is required in the amount of Ten percent (10%) of Proposal, made payable unconditionally to the Owner. Security shall be certified check, cashier's check or bid bond issued by surety licensed to conduct business in the State of Illinois. Within ten (10) days after notification of award of contract, the successful Contractor shall furnish a Performance Bond and Payment Bond in the amount of 100 percent of the contract and the payment of all obligations arising thereunder using a form similar to the AIA(R) 312 Form, or one acceptable to Owner. The Performance Bond will become a part of the Contract. The Owner reserves the right to accept or reject any or all bids, to waive any informalities and irregularities in any bid, or to make awards in the best interests of the Owner. The Bidder is a properly licensed Contractor according to the laws and regulations of the State of Illinois and meets qualifications indicated in the Procurement and Contracting Documents. The Contractor and all Sub-Contractors shall comply with the requirements of Sections 39S1 through 39S12, Chapter 48 of the Illinois Revised Statutes (1961) as compiled in 820 ILCS 130/1, et.seq. with reference to prevailing rates of wages. The Contractor and all Sub-Contractors shall pay or cause to be paid not less than the prevailing rates of wages as found by the Owner or Department of Labor or as determined by the Court on Review to all laborers, workmen, and mechanics and shall employ only Illinois laborers on said project Construction Duration May 29, 2023 - Start date, August 4, 2023- End date

Final Planning

Educational

$480,000.00

Public - County

Renovation

33

25

8

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
42
Bidding Soon
827
All Active Projects
321
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2023

November 3, 2023

img_map_placeholder

703 US-40, Troy, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.