Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Helena, Montana. Completed plans call for site work for a bridge / tunnel.
The Department of Transportation is seeking bids on Bridge Rail Repair on I-90 Eastbound mile marker 309. More information can be found in the IFB. The Montana Department of Transportation is accepting bids for Bridge Rail Repair on I-90 Eastbound mile marker 309. Questions or information relating to either specifications or requirements of this solicitation must be asked through the eMACS Q&A Board. Potential bidders must log into eMACS to submit a question on the Q&A Board. For general assistance with eMACS contact the eMACS Help Desk at emacs@mt.gov or (406) 444-2575. For assistance with vendor registration or responding to events please refer to the eMACS Resources website. Be sure to certify and submit your bid response once completed. The eastbound bridge over the MRL rail line on Interstate 90 at R.P. 309.59 (SID #01594) has significant bridge rail, and approach guardrail damage on the south (right) side of the bridge/roadway. The damaged section of guardrail/bridge rail starts approximately 75 feet from the west abutment and continues onto the bridge for approximately 115 feet. Remove all damaged approach guardrail sections (approximately 75 feet) and posts, damaged steel bridge tube rail (approximately 112 feet) on the south (right) side of the bridge, and 11 damaged type-5 bridge rail posts. Salvage and reuse the undamaged existing approach concrete curb taper. Supply new and replace all damaged bridge tube rail (3 sections approximately 30 feet, 41 feet and 41 feet in length), damaged type-5 rail posts, damaged approach guardrail sections and guardrail posts and tie new approach rail into existing concrete rail end block. Counting from the west abutment, replace posts #3 - #13. Perpetuate the existing splices in the tube rail at the current locations; approximately 3 feet past post #4, approximately 2 feet past post #9, and approximately 2 feet past post # 14. All existing type-5 rail post anchor bolts are undamaged and reusable except for 2 bolts on post # 10, 2 bolts on post #11 and 1 bolt on post #13 that are bent. Straighten and reuse these 5 bent anchor bolts. Supply and replace anchor bolts that are not salvageable in accordance with the ANCHOR BOLT REPAIR SPECIAL PROVISION. Supply all new bolts (except anchor bolts for type-5 posts), nuts, washers, blocks, spacers, transitions, tube splice hardware, and any other miscellaneous hardware for completing the installation. Field verify all dimensions, rail splice locations, damage quantities, and new repair materials needed before ordering or fabricating. The Commissioner of the Department of Labor and Industry, in accordance with Sections 18-2-401 and 18-2-402 of the Montana Code Annotated (MCA), has determined the standard prevailing rate of wages for the occupations listed in this publication. The wages specified herein control the prevailing rate of wages for the purposes of Section 18-2-401, et seq., MCA. It is required each employer pay (as a minimum) the rate of wages, including fringe benefits, travel allowance, zone pay and per diem applicable to the district in which the work is being performed as provided in the attached wage determinations. The contract work begins on a date mutually agreed upon by the contractor and MDT, after the issuance of the Purchase Order, but no later than June 5, 2023. The work is to be completed in 15 continuous working days, starting on the mutually agreed upon date. No work is allowed on Saturdays, Sundays, or State of Montana holidays.
Award
Bridges / Tunnels
$680,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2023
June 5, 2023
Multiple Locations, Helena, MT
Related To This Project
Helena, MT
Bid Date: Apr 04 2023
Helena, MT
Bid Date: Apr 12 2023
Helena, MT
Bid Date: Mar 30 2023
Helena, MT
Bid Date: Mar 21 2023
Helena, MT
--
Helena, MT
Bid Date: May 04 2023
Helena, MT
Bid Date: Apr 25 2023
Helena, MT
--
Helena, MT
Bid Date: Apr 19 2023
Helena, MT
Bid Date: Apr 25 2023
Helena, MT
Bid Date: Apr 07 2023
Helena, MT
Bid Date: Apr 17 2023
Helena, MT
Bid Date: Apr 06 2023
Helena, MT
Bid Date: Apr 06 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.