EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Las Vegas, Nevada. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

This project is located at Harry Reid International Airport and includes the construction of a 1.9- mile long storm drain system (RCP pipe, manhole/junction structures, and drop inlets) located north and south of Runway "8R-26L" inside the airfield. The two proposed storm drain system segments (located north and south of Runway "8R-26L") extend from an existing detention basin outfall structure located east of Runway "26L" and extends westerly towards the intersection of Taxiway "D". The work also includes excavation and export of accumulated sediment and debris within the existing detention basin flood control facility located east of Runway "26L." Infield re-grading and installation of major storm event ditch asphalt and concrete lining is also part of this project. The Project consists of one base bid and two alternates based on federal funding availability. All work is located inside the Harry Reid International Airport airfield. OWNER reserves the right to refuse to issue a bid form, or to accept a bid from a prospective Bidder should such Bidder be in default for any of the following reasons Each Bidder must furnish a Bid Guarantee equivalent to the appropriate percentage of the Bid Price described in Instructions to Bidders, Article 11.2, of the Contract documents. The "Bid Guarantee" shall consist of a firm commitment such as a Bid Bond, certified check, or other negotiable instrument accompanying a Bid as assurance that the Bidder will, upon acceptance of his Bid, execute such contractual documents as may be required within the time specified. The successful Bidder agrees to furnish a performance bond for 100 percent of the Contract price. This bond is one that is executed in connection with a Contract to secure fulfillment of all the Bidder's obligations under such Contract. The successful Bidder agrees to furnish a payment bond for 100 percent of the Contract price. This bond is one that is executed in connection with a Contract to assure payment as required by law of all persons supplying labor and material in the execution of the work provided in the Contract. Question Deadline 04/13/2023 at 1:30 PM PT

Award

Transportation Terminals

$34,432,563.00

Public - County

Paving, Site Work

137

27

37

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Joint Protection, Preformed Joint Seals, Joint Fillers, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Pipe Culverts, Concrete Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
15
Bidding Soon
368
All Active Projects
154
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

May 29, 2023

img_map_placeholder

5757 Wayne Newton Blvd, Las Vegas, NV

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

LAS Drainage Improvements at Runway 8-26

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.