BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Nashville, Tennessee. Completed plans call for the renovation of a educational facility.

**As of December 27, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Repair HVAC system to including replacement of roof top and heat pump units. CRAC units, and controls, including all related work Question Deadline Dec 14, 2023 Work of the Project includes construction of replacement of existing Schneider controllers, rooftop unit, CRAC units, water source heat pumps; associated controls work; and associated electrical work. Alternate 1 includes replacement of HVAC parts within an existing RTU. Alternate 2 includes repair and painting of screen walls. Alternate 3 includes replacement of VFD displays. B. Project Location: 120 White Bridge Pike, Nashville, TN 37209. C. Perform Work of Contract under fixed cost Contract with Owner according to Conditions of Contract. 1.3 CONTRACTOR`S USE OF SITE AND PREMISES A. Limit use of Site and premises to allow: 1. Owner occupancy. Owner staff regular work hours are 8:00 AM - 5:00 PM. B. Construction Operations: Limited to areas indicated on Drawings. 1. Noisy and Disruptive Operations (such as Blasting, Use of Jack Hammers and Other Noisy Equipment): Not allowed in close proximity to existing building during regular hours of operation. Coordinate and schedule such operations with Owner to minimize disruptions. C. General: Contractor shall have full use of premises for construction operations, including use of Project site, during construction period. Contractor`s use of premises is limited only by Owner`s right to perform work or to retain other contractors on portions of the Project. D. Utility Outages and Shutdown: 1. Coordinate and schedule electrical and other utility outages with Owner. 2. At least one week before scheduled outage, submit Outage Request Plan itemizing the dates, times, and duration of each requested outage E. Construction Plan: Before start of construction, post electronic file to Project website of construction plan regarding access to Work, use of Site, and utility outages for acceptance by Owner. After acceptance of plan, construction operations shall comply with accepted plan unless deviations are accepted by Owner in

Bid Results

Educational

$652,180.00

Public - State/Provincial

Renovation

63

20

12

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
91
Bidding Soon
1,098
All Active Projects
464
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 20, 2023

January 19, 2024

January 3, 2025

img_map_placeholder

120 White Bridge Rd, Nashville, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.