BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Clarksburg, West Virginia. Completed plans call for the renovation of a municipal facility.

*(04/10/2023)-AMENDMENT TWO- Answering Questions Received. Q: On the paperwork the size standard is 15 million is this correct A: The size standard is based off of the naics code. 15 mil is correct, this is a small business set aside. Q: What papers need to be turned in for the bid just the form 1449 How do we submit the bid A: This information can be found at the bottom of the RFP document. Complete all blocks on the RFP, SF1449. Each proposal shall be submitted in one e-mail and separated via attachment in three (3) separate and distinct parts/volumes: o Volume I: Technical Approach o Volume II: Past Performance o Volume III: Price (Section B) Q: I did not see anything regarding a bid bond. A: This is a services contract. No bid bond will be required. Q: Are Steel Pro-Press Fittings acceptable A: Yes This is a solicitation to replace the failed Heating Hot Water Coil in Air Handler Unit (AHU) C41 in the Main Administrative Building at the Federal Bureau of Investigation (FBI) CJIS Division, Clarksburg, WV. A site visit will be held for all interested vendors on Monday, April 3rd 2023 at 9:00 a.m. EST. Only two individuals from each vendor will be able to participate. Please send the name(s) of those interested in attending to Contracting Officer Logan Swiger at lswiger2@fbi.gov to receive a Site Access Request Form. All Site Access Request Forms will be due no later than 10:00 a.m. EST on Thursday, March 30th 2023 to allow time for processing. All questions are due to the Contracting Officer, Logan Swiger, at lswiger2@fbi.gov, by 12:00 p.m. EST (noon) on Friday, April 7th 2023. Please send all proposals to lswiger2@fbi.gov by 10:00 a.m EST on Monday, April 24th, 2023. Any proposals received after 10:00 a.m. EST on Monday April 24th, 2023 will NOT be considered. (04/04/2023)-AMENDMENT ONE-Adding photos from the site visit. Line Period of Performance: 05/01/2023 - 11/01/2023

Post-Bid

Municipal

$600,000.00

Public - Federal

Renovation

13

10

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
20
Bidding Soon
353
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2023

May 11, 2023

img_map_placeholder

1000 Custer Holw Rd, Clarksburg, WV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.