Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a religious / funeral development in Cherry Valley, Arkansas. Completed plans call for the construction of a religious / funeral development; and for site work for a religious / funeral development.
Arkansas State Veterans Cemetery - Birdeye Phase 2, 3600 HWY 163, Birdeye, Arkansas 72324, for the Arkansas Department of Veterans Affairs A bid security in the amount of 5% shall accompany each bid, if the bid is more than $50,000.00 The State reserves the right to reject any or all bids and to waive any formalities. Site Description a. Project description, intended use after NOI is filed: The development will consist of various improvements to the existing cemetery including but not limited to: sidewalk repair/replacement, drainage structure repair/replacement, utility improvements such as fiber optic services and electrical services, administrative and maintenance building enhancements, new irrigation and landscaping throughout the site, earthwork and associated activities involved in creating a new burial section, and new concrete pavement in limited areas. b. Sequence of major activities which disturbsoils: Prior to any surface disturbance the site perimeter BMP's including silt fence or wattles, and the major inlet protection for existing storm inlets and rock check dams for existing concentrated flow areas shall be constructed. This will include concrete washouts. After these initial temporary BMP's are in place, demolition activities will be allowed to occur within the limits of construction. During the demolition activities and throughout the entire length of the project, additional erosion control BMP's shall be constructed as needed including but not limited to the use of watering trucks for dust control. The following will commence at the discretion of the contractor's construction schedule but will include: Earthwork and initial grading to prepare the site for construction access drives. Heavier mass grading activities will commence in the new burial section. Any dewatering of excavations shall be discharged into a filter to remove sediments prior to ultimate discharge to the creek. After major areas of mass grading are completed, additional BMP's will be constructed at the toe of slopes and at new areas of concentrated flows. Areas that will not be disturbed for 14 days or longer will receive temporary stabilization with mulch, hydro-mulch or other Engineer approved measure. Private utilities and storm infrastructure will be installed. New and existing storm inlets shall be protected with BMP's. Lastly, final grading, then landscaping and final stabilization. Work will progress according to the Contractor's schedule. Upon completion of work and final stabilization of all disturbed areas temporary BMP's will be removed. c. Total Area: 99.14 Acres Disturbed Area: 4.35 Acres
Bid Results
Religious / Funeral
$1,340,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 8, 2023
October 9, 2023
3600 AR-163, Cherry Valley, AR
Related To This Project
Cherry Valley, AR
Bid Date: Aug 08 2023
Cherry Valley, AR
Bid Date: Aug 08 2023
Cherry Valley, AR
Bid Date: Aug 08 2023
Cherry Valley, AR
Bid Date: Aug 08 2023
Cherry Valley, AR
Bid Date: Aug 28 2023
Cherry Valley, AR
Bid Date: Jan 12 2022
Cherry Valley, AR
Bid Date: May 14 2024
Cherry Valley, AR
Bid Date: May 14 2024
Cherry Valley, AR
Bid Date: Jun 09 2022
Cherry Valley, AR
Bid Date: Jun 16 2022
Cherry Valley, AR
Bid Date: Apr 08 2022
Mena, AR
Bid Date: Apr 26 2023
Fayetteville, AR
Bid Date: May 22 2023
Bryant, AR
--
Russellville, AR
Bid Date: Apr 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.