BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Rangeley, Maine. Completed plans call for site work for a water / sewer project.

The Rangeley Water District is requesting bids from selected contractors for the construction of the Haley Pond Stream Water Main Replacement Project. The work under this contract is generally described as the Replacement of water main on Richardson Avenue and a cross country run between Richardson Avenue and Lake House Road. The work includes approximately 730 linear feet of 10-inch HDPE water main, 1 hydrant, 5 service connections and a stream crossing. The time of substantial completion is 90 days with project completed and ready for final payment within 120 days. The Owner reserves the right to waive any informalities or to reject any or all bids. No Bidder may withdraw his bid within 60 days after the actual date of the opening thereof. PDF copies are available for $25.00 Bid Bond A certified check or bank draft payable to the OWNER or a satisfactory Bid Bond executed by the Bidder and a Surety Company in the equal to five percent (5%) of the Bid shall be submitted with each bid. No bid may be withdrawn for at least 60 days after receipt of bids unless released by the owner. Disadvantaged Business Enterprise Requirements Each Bidder shall take special notice of the Guidance for use of Disadvantaged Business Enterprise in the DWSRF Supplemental General Conditions. Failure to complete these requirements may result in finding that the Bidder is nonresponsive and therefore, not eligible to be awarded this contract. Complete requirements are located in the Bid Documents. Nondiscrimination in Employment and Labor Standards Bidders on this work will be required to comply with the President's Executive Order No. 11246 and amendments and supplements to that Order. The requirement for Bidders and CONTRACTORS under this Order are located in the DWSRF Supplemental General Conditions. Davis-Bacon Requirements Davis-Bacon and Related Acts are requirements of this contract. The Contractor must comply with all permits, restrictions and conditions, issued for the Project by Federal Cross-cutting Authorities (Attachment D). All (if any) permits, restrictions and conditions are attached and made part of the Contract Documents. American Iron and Steel The Contractor shall comply with the Use of American Iron and Steel requirements of the Consolidated Appropriations Act, 2014 on this project. Federal Requirements The Contractor must comply with the Department of Labor Regulations relating to Copeland "Anti-Kickback" Act (18 U.S.C. 874) as supplemented by 29 CRF part 3, Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330) as supplemented by 29 CFR part 5, Occupational Safety and Health Standards (OSHA) (29 CFR part 1910). The Contractor must comply with all applicable standards, orders, or requirements issued under section 306 of the Clean Air Act (42 U.S. C. 1857(h)), section 508 of the Clean Water Act (33 U.S.C. 1368), and Executive Order 11738, the Safe Drinking Water Act and the Environmental Protection Agency regulations (40 CFR Part 15). The CONTRACTOR must comply with all permits, restrictions and conditions, issued for the PROJECT by Federal Cross-cutting Authorities. Disclaimer Any Contract awarded under this Advertisement for Bids is expected to be funded in part by the Drinking Water State Revolving Fund. This Contract contains State Revolving Fund requirements. Neither the State of Maine nor any of its departments, agencies, or employees is or will be a party to this Contract. Award of any Contract will be contingent upon final financial agreements between the Owner, Department of Health and Human Services and Maine Municipal Bond Bank and the Rangeley Water District obtaining the necessary easements. The Rangeley Water District is an Equal Employment Opportunity Employer. Date: March 31, 2023 Dirigo Engineering 2 Dirigo Drive Fairfield, ME 04937 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: [Rick Pershken, Dirigo Engineering - rick@dirigoeng.com]

Award

Water / Sewer

$247,420.00

Public - City

Site Work

4

15

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
11
Bidding Soon
242
All Active Projects
87
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2023

August 14, 2023

img_map_placeholder

Richardson Avenue and Lake House Road, Rangeley, ME

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.