EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 31, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Rangeley, Maine. Completed plans call for site work for a water / sewer project.

The Rangeley Water District is requesting bids from selected contractors for the construction of the Haley Pond Stream Water Main Replacement Project. The work under this contract is generally described as the Replacement of water main on Richardson Avenue and a cross country run between Richardson Avenue and Lake House Road. The work includes approximately 730 linear feet of 10-inch HDPE water main, 1 hydrant, 5 service connections and a stream crossing. The time of substantial completion is 90 days with project completed and ready for final payment within 120 days. The Owner reserves the right to waive any informalities or to reject any or all bids. No Bidder may withdraw his bid within 60 days after the actual date of the opening thereof. PDF copies are available for $25.00 Bid Bond A certified check or bank draft payable to the OWNER or a satisfactory Bid Bond executed by the Bidder and a Surety Company in the equal to five percent (5%) of the Bid shall be submitted with each bid. No bid may be withdrawn for at least 60 days after receipt of bids unless released by the owner. Disadvantaged Business Enterprise Requirements Each Bidder shall take special notice of the Guidance for use of Disadvantaged Business Enterprise in the DWSRF Supplemental General Conditions. Failure to complete these requirements may result in finding that the Bidder is nonresponsive and therefore, not eligible to be awarded this contract. Complete requirements are located in the Bid Documents. Nondiscrimination in Employment and Labor Standards Bidders on this work will be required to comply with the President's Executive Order No. 11246 and amendments and supplements to that Order. The requirement for Bidders and CONTRACTORS under this Order are located in the DWSRF Supplemental General Conditions. Davis-Bacon Requirements Davis-Bacon and Related Acts are requirements of this contract. The Contractor must comply with all permits, restrictions and conditions, issued for the Project by Federal Cross-cutting Authorities (Attachment D). All (if any) permits, restrictions and conditions are attached and made part of the Contract Documents. American Iron and Steel The Contractor shall comply with the Use of American Iron and Steel requirements of the Consolidated Appropriations Act, 2014 on this project. Federal Requirements The Contractor must comply with the Department of Labor Regulations relating to Copeland "Anti-Kickback" Act (18 U.S.C. 874) as supplemented by 29 CRF part 3, Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330) as supplemented by 29 CFR part 5, Occupational Safety and Health Standards (OSHA) (29 CFR part 1910). The Contractor must comply with all applicable standards, orders, or requirements issued under section 306 of the Clean Air Act (42 U.S. C. 1857(h)), section 508 of the Clean Water Act (33 U.S.C. 1368), and Executive Order 11738, the Safe Drinking Water Act and the Environmental Protection Agency regulations (40 CFR Part 15). The CONTRACTOR must comply with all permits, restrictions and conditions, issued for the PROJECT by Federal Cross-cutting Authorities. Disclaimer Any Contract awarded under this Advertisement for Bids is expected to be funded in part by the Drinking Water State Revolving Fund. This Contract contains State Revolving Fund requirements. Neither the State of Maine nor any of its departments, agencies, or employees is or will be a party to this Contract. Award of any Contract will be contingent upon final financial agreements between the Owner, Department of Health and Human Services and Maine Municipal Bond Bank and the Rangeley Water District obtaining the necessary easements. The Rangeley Water District is an Equal Employment Opportunity Employer. Date: March 31, 2023 Dirigo Engineering 2 Dirigo Drive Fairfield, ME 04937 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: [Rick Pershken, Dirigo Engineering - rick@dirigoeng.com]

Award

Water / Sewer

$247,420.00

Public - City

Site Work

4

15

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
21
Bidding Soon
282
All Active Projects
133
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2023

August 14, 2023

img_map_placeholder

Richardson Avenue and Lake House Road, Rangeley, ME

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Haley Pond Stream Water Main Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.