BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Safford, Arizona. Completed plans call for site work for a water / sewer project.

Bids will be accepted from Bidders who do not attend the pre-bid conference.The Project generally consists of the following Work: Grading of the tank site, installation of foundation for the tank, and construction of the welded, steel storage tank. The Project shall include all excavation, subgrade preparation, engineered fill installation, steel tank construction, and appurtenances necessary to complete the Work in accordance with the Project plans and specifications. Additional improvements as shown on the Drawings and noted in the specifications shall be required. The Work is expected to be substantially complete in 150 days and ready for final payment in 180 days. The Owner understands and will work with Contractors regarding longer than usual lead times as necessary.Further requirements regarding Bid Submittal and qualifications are in the Instructions to Bidders included in the Bidding Documents. The Owner reserves the right to accept the lowest, responsive, and responsible Bid, to reject any or all Bids, and to waive irregularities or informalities in any Bid. Bids received after the specified time of closing will be returned unopened. The Owner reserves the right to hold any or all Bids for a period of sixty (60) days after the date of opening. Bidders will not be allowed to withdraw their Bids during the sixty (60) day period. Owner is an Affirmative Action/Equal Opportunity Employer and issued this advertisement. Question Deadline 04/27/2023 Questions shall be received in writing up to seven (7) business days before the Bid Opening. Address all questions to Chad Crockett, PE, Bowman, ccrockett@bowman.com. Only written questions will be addressed. The project shall include all excavation, subgrade preparation, engineered fill installation, steel tank construction, and appurtenances necessary to complete the work in accordance with the project plans and specifications. Additional improvements as shown on the Drawings and noted in the specifications shall be required Grading ofthe tank site, installation of a foundation for the tank, and the construction of a welded steel storage tank.

Bid Results

Water / Sewer

$50,000.00

Public - City

Site Work

7

15

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
3
Bidding Soon
76
All Active Projects
28
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.