BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2024 at 7:00 PM

Updated April 10, 2024

Site work and renovation of a water / sewer project in Agawam, Massachusetts. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of June 8, 2023, the project has been awarded, however, timeline for construction has not been confirmed. The general contractor has 730 calendar days to complete the project once notice to proceed has been issued. Please be advised that the Springfield Water and Sewer Commission (Commission's) RFQ Prequalification Committee has reviewed and ranked all submitted Statements of Qualifications for General Contractors (GC) . This prequalification selection was completed . The following firms have been prequalified and are hereby invited to submit a bid for the Construction Bid portion of this project, which will be identified as Commission SRWTF Grit Removal Upgrade. All questions regarding bid or its specifications must be made in writing and received by the Office of Procurement, and 5/4/23, 4:30 P.M. (for General Bidders). Contact: Theo G. Theocles, Esq., Director of Legal Affairs/ CPO (theo.theocles@waterandsewer.org). The Chief Procurement Officer reserves the right to waive any informality in and to reject any or all bids if it is in the public interest to do so.If you have any questions, please do not hesitate to contact me directly. Project Description: Project consists of construction of a new Grit Removal System at the Springfield Regional Wastewater Treatment Facility (SRWTF), consisting of four (4) mechanically induced vortex units upstream of the Primary Sedimentation Basins and constructed with a drilled micropile foundation. Influent and effluent channels, slide gates, platforms, stairs, handrails, and guardrails will be installed around the vortex units. Four (4) grit pumps with associated piping, appurtenances, instrumentation and controls, and grit handling equipment including two (2) classifiers and six (6) hydrocyclones, along with replacement of primary sludge and grit slurry piping, are included. Other work includes installation of electrical and instrumentation and controls systems, relocation of existing utilities, and site restoration. The time for completion of this project is 730 calendar days. The estimated project value is $25 Million. 4.2 percent D/MBE participation and 4.5 percent D/WBE participation

Award

Water / Sewer

$17,740,000.00

Public - City

Renovation, Site Work

348

48

99

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
654
Active Projects
266
Bidding Soon
4,878
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2023

June 22, 2023

Project location map

250 M St, Agawam, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.