BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lake Geneva, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Aggregate, Paving - Concrete, Roadway Pavement Markings, Pavement - Marking, Sidewalks/Curbs/Gutters, Street/Road Asphalt Resurfacing and Milling, Concrete Pavement, Street/Road Asphalt Milling, ADA Curb Ramps, Traffic Control, Curbs, Paving (Trail Paving), Grubbing & Clearing, Concrete Pavement Removal, Paving (Asphalt or Concrete) Description: The work includes furnishing of all materials and equipment and performance of the following work, according to the Plans, Specifications and Contract Documents (PS & CD). The Base Bid work for the above contract includes the following treatments to the respective streets, alleyways, and parking lots: Full Pavement Reconstruction: o Lake Geneva Boat Parking Lot F (at S Lakeshore Dr / Baker St) 3-Inch (Full Depth) Asphalt Mill and Overlay: o North St / St Alleyway (between Cook St / Broad St) o Waverly St Alleyway (between Spring St / Haskins St) o George St / Wheeler St Alleyway (between Elkhorn Rd / Tolman St) 2-Inch Asphalt Mill and Overlay: o Circle Dr (at Miller Rd) o Elm St (between W South St / Maple St) o Henry St (between Williams St / Center St) o Horace St (between Grant St / Wheeler St) o North St (between Warren St / Madison St) o Pond View Ln (at St) o St (between Pond View Ln / McDonald Rd) o Fair View Ln (between Sky Lane Dr / Termini) o Sky Lane Dr (between Fair View Ln / Linda Ln) o Wells St (between Cass St / Campbell St) New Sidewalk will also be constructed on the North side of Baker Street as a part of this project. Also included is the repaving of the Bike Path on the North side of Townline Road from Hudson Trail to Edwards Boulevard. Major work items and approximate quantities include: 3,500 tons HMA Pavement, 7,000 SF of Concrete Sidewalk, 2,500 LF of Concrete Curb & Gutter, 3,400 CY of excavation common / excavation common - EBS, 5,400 TON of Base Aggregate Dense, and 6,000 SY of landscape restoration. These improvements also include clearing & grubbing, driveway replacement, sawing asphalt and concrete, traffic control, pavement markings, and erosion control.

Award

Roads / Highways

$1,179,720.00

Public - City

Paving, Site Work

65

11

16

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
123
Bidding Soon
2,069
All Active Projects
866
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2023

May 19, 2023

img_map_placeholder

Multiple Locations, Lake Geneva, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.