BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Asbestos abatement and renovation of a municipal facility in Carson City, Nevada. Completed plans call for the renovation of a municipal facility; and for asbestos abatement for a municipal facility.

Environmental Remediation This project consists of asbestos containing materials (ACM) abatement work within the crawl space and basement areas of buildings 3, 57, 65, and 67 of the Stewart Campus Site. Upon completion of the ACM removal, the contractor will be responsible for installing new piping insulation, replacing thermal system insulation (TSI) that has been removed. The work includes the installation of a vapor barrier at all buildings identified within the project documents DESCRIPTION OF WORK A. The work covered by this section involves the pre-renovation removal of asbestos-containing material (ACM) from buildings designated 3, 57, 65, and 67 at the Stewart Campus in Carson City, Nevada. Further, the work covered by this section includes the removal and handling of (ACM) considered to be NESHAP Regulated ACM (RACM) and Category I ACM. These ACM are considered to be Class I and Class II ACM pursuant to 29CFR 1926.1101. The ACM to be removed from the buildings prior to renovation are: black wall tar, thermal system insulation (TSI) pipes, and TSI elbows. The general locations and types of ACM to be removed prior to renovation according to this section are indicated on the accompanying Drawing Sheets PD-1 through PD-4. These drawings are provided for informational purposes only. Contractor is to field verify the quantity or extent of all indicated ACM prior to bidding and is to include in his bid price the removal of all ACM of the type and description indicated on the PD series drawings. This specification section addresses work requirements for those materials considered to be ACM. The work includes the decontamination of items and surfaces in work areas which are currently contaminated or become contaminated with ACM debris. This section also describes procedures and equipment required to protect workers and occupants of the work areas and adjacent areas from contact with airborne asbestos fibers and ACM dust and debris. The work also includes the disposal of the generated ACM wastes. A summary of each general category of ACM removal and accompanying work task, are presented in Part 3 herein.

Award

Municipal

$238,674.00

Public - State/Provincial

Asbestos Abatement, Renovation

12

18

2

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
15
Bidding Soon
224
All Active Projects
94
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2023

July 17, 2023

img_map_placeholder

5500 Snyder Ave, Carson City, NV


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.