Published August 9, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Waldwick, New Jersey. Completed plans call for site work for a water / sewer project.

The work to be performed under this contract includes the following: Installation of Dual Granular Activated Carbon Systems at each point of entry for wells 2, 3, 4/5, 6 and 7 in the Borough of Waldwick. Principal items of work in the project include: . L.S. Granular Activated Carbon System Well 2, 3, 4/5, 6, 7 . L.S. Insulation Well 2, 3, 4/5, 6, 7 . L.S. Concrete Pad and Site Work Well 2, 3, 4/5, 6, 7 . L.S. Sodium Hypochlorite Feed Systems . 1,460 L.F. 6 Inch Ductile Iron Pipe . 175 L.F. 12 Inch Ductile Iron Pipe . 75 L.F. 20 Inch Ductile Iron Pipe . 145 L.F. 24 Inch Ductile Iron Pipe . 110 L.F. 30 Inch Ductile Iron Pipe The work contemplated under this Contract shall be completed within 350 calendar days. Each bid must be made upon the prescribed forms, furnished with the Contract Drawings and Specifications, including the non-collusion affidavit and ownership statement compliance form and must be accompanied by a Consent of Surety and a certified check, cashier's check, or Bid Bond of not less than ten (10%) percent of the amount bid and, not to exceed $20,000.00. Such checks and Bonds shall be made payable to the Owner and will be held as a Guarantee that in the event the Bid is accepted and a Contract awarded to the bidder, the Contract shall be duly executed and its performance properly secured. The successful bidder shall furnish and deliver to the Owner a performance and payment bond in the amount of 100 percent of the accepted bid amount as security for the faithful performance and payment of the Contract. Further, the successful bidder must furnish the policies or Certificates of Insurance required by the Contract. In default thereof, said checks and the amount represented thereby will be forfeited to the aforesaid Owner as liquidated damages. Bids must be accompanied, in the case of corporations not chartered in New Jersey, by proper certificate that such corporation is authorized to do business in the State of New Jersey. Project is funded by the New Jersey Infrastructure Bank and the successful bidder must comply with all the provisions of N.J.A.C. 7:22 9.1 et. seq. for the participation of socially and economically disadvantaged individuals (SED's). Pursuant to N.J.A.C. 10:5-33: "Bidders are required to comply with the requirements of P.L. 1975, c.127." This contract or subcontract is expected to be funded in part with funds from the New Jersey Department of Environmental Protection and the New Jersey Environmental Infrastructure Trust. Neither the State of New Jersey, the New Jersey Environmental Infrastructure Trust nor any of their departments, agencies or employees is, or will be, a party to this contract or subcontract or any lower tier contract or subcontract. This contract or subcontract is subject to the provisions of N.J.A.C. 7:22-3, 4, 5, 9 and 10. Surety bonds must be written by surety companies listed on Department Circular 570 according to N.J.A.C. 7:22-3.17(g). Bidders are required to comply with N.J.A.C. 7:22-3.17(a) 24 and 7:22-4.17(a), or 7:22-6.17(a) 24, which require that no less than 10 percent of the total amount of all contracts related to the project shall be awarded to SEDs. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 regarding equal employment opportunity, as amended. All corporations and partnerships must comply with Chapter 33, of the P.L. of 1977, regarding disclosure of partners and stockholders. Each bid must be enclosed in a sealed envelope bearing the name and address of the bidder, addressed to the Owner and labeled for the WATER TREATMENT SYSTEM IMPROVEMENTS. The successful bidder will be required to comply with all provisions of prevailing wage rates as determined by the New Jersey Department of Labor. All bids shall be irrevocable, not subject to withdrawal and shall stand available for a period of sixty (60) days. The contract will be awarded within 60 days of bid opening in accordance with N.J.S.A. 40A:11-24. The contract will be awarded to the lowest responsible bidder in accordance with N.J.S.A. 40A:11-16(c). The Owner reserves the right to reject any and all bids, to waive informalities or irregularities in the bids received and to accept the bid from the lowest responsible bidder.

Award

Water / Sewer

$5,156,000.00

Public - City

Site Work

47

16

2

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Specialty Placed Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Grouting, Unit Masonry, Clay Unit Masonry, Glass Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Art, Furnishings and Accessories, Rugs and Mats, Runners
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Enclosed Bus Assemblies, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Machining Equipment, Drilling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
554
Active Projects
319
Bidding Soon
5,250
All Active Projects
2,334
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2023

August 10, 2023

img_map_placeholder

Multiple Locations, Waldwick, NJ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water Treatment System Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.