Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition and site work for a playground / park / athletic field in San Francisco, California. Completed plans call for site work for a playground / park / athletic field.
The Project is described as: The improvement of the irrigation system at the National AIDS Memorial Grove at Golden Gate Park. Hand digging, trenching, installing piping, valves, irrigation components and restoring planting areas. Scope of work will only include installing new mainlines, valve and controller wiring installation (on new and existing valves), valve manifold installation (on new and existing mainline), conduit, electrical and power connection, and demo existing lines. TRADES REQUESTED: DEMO | EARTHWORK | LANDSCAPING | PLUMBING | ELECTRICAL Sheet I-1 o Unless noted differently, all piping, valves, quick couplers, sprinklers shown in light color are existing to remain in service. use caution when trenching. (typical) o All lateral lines, utilities, and sprinkler head locations must be marked and approved by city representative before construction. Install all main lines and electrical conduit under tree canopy carefully to avoid damage to trees and to tree roots. Re-routing of main lines may be required.Roots under 2" shall be cut cleanly, with clean sharp tools, but only if necessary for laying pipe. Minimum depth of main line pipe to be 18" (typical). o Pot hole and locate existing main line that services quick couplers along creek bed. Cap in this approximate location (3). Remove existing quick coupling valves that are no longer operational. (est.6 QCVs) o Route new two wire cable to existing valves thru existing conduit. o Sweep conduit and two wire cable into gate valve box. Install waterproof splices on end of wire o Locate existing gate valve that services fountain. Remove and connect new 2" galvanized pipe to from new main line. o Pot hole and locate existing main line that services existing quick coupling at location (7). Install new gate valve in existing line. Use hymax or equal repair coupling on each side of valve when connecting. o Pot hole and locate existing main line that services quick couplers along trail. Cap in this approximate location. Remove existing quick coupling valves that are no longer operational. (est. 12 QCVs) o Install new main and conduit in the middle of existing dirt pathways where possible. Sheet I-2 o Irrigation controller "ag". Mount in specified security enclosure at this location as detailed and as directed by architect. Connect to existing 120 volt A.C. electrical service installed at this location under site electrical contract. Irrigation contractor shall coordinate location or electrical service prior to construction. o Unless noted differently, all piping, valves, quick couplers, sprinklers shown in light color are existing to remain in service. Use caution when trenching. (typical) o Pot hole and locate existing 4" D.I. main line along parkway strip. Install new 4" Tee with flanged gate valve as detailed. o Pot hole and locate existing 4" main line. Install double strapped S.S. saddle (sized for ductile iron pipe) onto existing pipe to service angle valve and remote control valve(s). o Install new remote control valve onto existing service line to existing valve. Re-pipe as required. o Install new main and conduit in the middle of existing dirt pathways where possible. Sheet I-3 o Route new two wire cable to existing valve thru existing conduit. Install new decoder at valve. Use existing wires to pull wire. o Sweep conduit and two wire cable into gate valve box. Install waterproof splices on end of wire. o 1.5" sch 40 PVC conduit with required sweeps, pull rope and pull boxes for two wire cable. Route with main line as detailed. (typical) Waterproof ends of conduit with foam. o Route 1.25" conduit and 2-wire cable from new controller into each cluster of remote control valves. Connect wires to valves. Waterproof ends of conduit. Use sweeps as required. (typical at all valves) o Single station decoder. Install within valve box as detailed. (typical at all valves) Sheet I-4 o Route new two wire cable to existing valve thru existing conduit. Install new decoder at valve. Use existing wires to pull wire. o 1.5" sch 40 PVC conduit with required sweeps, pull rope and pull boxes for two wire cable. Route with main line as detailed (typical) waterproof ends of conduit with foam. o Route 1.25" conduit and 2-wire cable from new controller into each cluster of remote control valves. Connect valves to wires. Waterproof ends of conduit with foam. Use sweeps as required. (typical at all valves) o Route 1.25" conduit and 2-wire cable through existing planting areas. Use caution with existing pipes when trenching. Waterproof ends of conduit with foam. o Route 1.25" conduit and 2-wire cable through existing turf area. Sod cut existing turf prior to trenching then replace once conduit is installed and backfill has been compacted. Use caution with existing pipes when trenching. Waterproof ends of conduit with foam. o Irrigation controller "ag". Mount in specified security enclosure at this location as detailed and as directed by architect. Connect to existing 120 volt A.C. electrical service installed at this location under site electrical contract. Irrigation contractor shall coordinate location or electrical service prior to construction. Waterproof ends of conduit with foam. o Single station decoder. Install within valve box as detailed. (typical at all valves) o Install conduit along edge of asphalt path. Bore underneath pathway if needed. All questions regarding this project are due no later than Wednesday, April 5, 2023 by 5pm. Questions must be emailed to Phoskirt.Manikalak@sfgov.org and cc bridget.webster@sfgov.org
Bid Results
Playgrounds / Parks / Athletic Fields
$358,741.00
Public - City
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 12, 2023
May 12, 2023
Bowling Green Dr & Nancy Pelosi Dr, San Francisco, CA
Related To This Project
San Francisco, CA
Bid Date: Apr 19 2023
San Francisco, CA
Bid Date: Apr 10 2023
San Francisco, CA
Bid Date: May 03 2023
San Francisco, CA
Bid Date: May 12 2023
San Francisco, CA
--
San Francisco, CA
Bid Date: May 09 2023
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
Bid Date: May 05 2023
San Francisco, CA
--
San Francisco, CA
Bid Date: Apr 14 2023
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
Bid Date: Apr 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.