Published January 10, 2025 at 7:00 PM

Updated January 11, 2025

Site work for a playground / park / athletic field in Milton, Georgia. Conceptual plans call for site work for a playground / park / athletic field.

Update: https://www.miltonga.gov/home/showpublisheddocument/7894/638697024952230000 The Former Milton Country Club Master Plan was adopted August 19, 2019. For the active acres, the master plan called for the renovation of the clubhouse to support active, indoor recreation programming. As part of this renovation, the existing cart barn to the east of the building along with other structures are to be removed. Throughout the phasing, the plan suggests for additional parking, tennis courts, pool improvements, sand volleyball courts and a covered addition onto the back side of the clubhouse. In April 2023, PRAB and Council provided guidance to staff re-prioritizing the long-term funding for projects. During this discussion, several components of the Park Master Plan were removed. The park components removed include the fireplace, sand volleyball courts, 100% inclusive playground and the expanded event lawn. The bioswale located to the south of the building was also deemed unnecessary, as long as it's not truly needed to collect water runoff. Staff to be applying for LWCF Grant funding through DNR to fund the majority of Concept "B". The estimated cost for this project is $1.4 million, with $500,000 in support from the grant. Concept "A" - Renovation of the building (COMPLETE) Concept "B" - Reconfiguration of the building , 2 additional tennis courts, tennis viewing deck, event lawn, sand volleyball courts, "inclusive" playground, bioswale to catch water, parking lot improvements Concept "C" - Outdoor fireplace, larger back patio, additions to viewing deck, waterslide for pool, improved "event lawn" and enhanced landscaping Cost Estimate: Concept B - $1.8-$2.0 million Cost Estimate: Concept C - $900,000 Long-term impact: Resurfacing tennis courts every 5-7 years- budget $8,000 per year, stain viewing deck every 5 years (minimal) Operating: landscape improvement upkeep ($5000 per year) Operating: Pool slide maintenance and staffing ($18,000 per year) Operating: LED light conversion, decreased annual costs ($1,000-$2,000 per year) Project is included City of Milton Fiscal Year 2025-2031 Page No 273 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The Former Milton Country Club Master Plan was adopted August 19, 2019. For the active acres, the master plan called for the renovation of the clubhouse to support active, indoor recreation programming. As part of this renovation, the existing cart barn to the east of the building along with other structures are to be removed. Throughout the phasing, the plan suggests for additional parking, tennis courts, pool improvements, sand volleyball courts and a covered addition onto the back side of the clubhouse. Project is included in the City of Milton's FY 2024-2030 Capital Improvement Program (CIP). As of February 5, 2024, information regarding a design team or a general contractor is not available. Funding is anticipated from 2024 to 2027.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Playgrounds / Parks / Athletic Fields

$932,993.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
335
Active Projects
204
Bidding Soon
2,324
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

1785 Dinsmore Rd, Milton, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.