EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 24, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Kiln, Mississippi. Completed plans call for the renovation of a educational facility.

Summary Project Description: This project will consist of the following general scope of work. This description is provided for convenience purposes only and shall not be considered all inclusive. It is the general contractors responsibility to become fully famliar with the existing conditions, review all of the construction document drawings, specifications, and any additional information documents in their entirety and bring forth any and all questions regarding scope confusion, misinterpretations, and/or possible errors and omissions to the Architect and/or Engineer prior to bid submission and/or start of construction. This project consists of renovating the existing restrooms in the Hancock County High School as described in the Construction Documents and Specifications. as described in the Construction Documents and Specifications. Background checks will be required of all General Contractor staff, Sub-Contractor staff, vendor staff, suppliers, etc. that will need access to the school during the construction process. A government issued picture ID is required in order to perform the background check. The contractor will be required to use the school districts system to perform the background checks, and the general contractor will be required to pay all costs associated with them. Contact the School district for more information regarding the cost associated with the background checks. Contract Terms: Lump sum (fixed price, stipulated sum). Last Request for Substitution Due: 7 days prior to due date of bids. Last Request for Information Due: 7 days prior to due date of bids. All bid amounts must be based on the most stringent requirement called for in the complete construction document package. In addition, the most stringent requirement shown shall govern and take precedence in the event of any and all conflicts between different drawings (plans, elevations, details, sections, schedules, etc), between different specification sections, within specification sections, and between the drawings and the specifications. It will be the General Contractors responsibility to bring any and all discrepancies to the architects attention for further clarity prior to submitting a formal bid. Notice to Proceed: Will be issued after bid due date with anticipated starts dates as shown below. Bids May Not Be Withdrawn Until: 60 days after due date. Contract Time: As described in Document 004100 - Bid Form. Final Completion date is critical due to requirements of Owners operations. The Owner reserves the right to change the schedule or terminate the entire procurement process at any time. Bids shall be accompanied by a security deposit as follows: Bid Bond of a sum no less than 5 percent of the Bid Amount on AIA A310 Bid Bond Form.

Bid Results

Educational

$898,995.00

Public - County

Renovation

47

20

8

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
39
Bidding Soon
397
All Active Projects
200
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2023

June 8, 2023

img_map_placeholder

7070 Stennis Airport Rd, Kiln, MS

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.