Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a detention facility in Lompoc, California. Completed plans call for the renovation of a detention facility.
Sol : 15BFA023C00000030 The Federal Bureau of Prisons (FBOP) is issuing solicitation 15BFA023B00000033 for the of a firm-fixed-price construction contract for a project entitled FIRE DETECTION AND ALARM SYSTEM at the Federal Correctional Complex (FCC LOMPOC), in Lompoc, California. FCC LOMPOC is a Federally owned facility at 3901 Klein Blvd., Lompoc, California 93436. The Work of Project is defined by the Contract Documents and consists of the following: 1. FCC Lompoc consists of following institutions and support buildings below: a. 1 medium security (fenced) correctional institution - The fire alarm upgrade will be under FCI Medium Facility . b. 1 low facility (fenced) correctional institution - The fire alarm upgrade will be under FCI Low Facility . c. 2 minimum security (non-fenced) institutions, support buildings such as Training Center, Powerhouse, Armory, UNICOR, Transportation building, etc. - The fire alarm upgrade will be under the FCC Site Wide. 2. FCI Medium Facility is a medium security Federal Prison for male inmates at Lompoc, California. The site consists of variety of buildings, including administration building, special housing unit (shu), housing unit, food building, facilities buildings, trade shops, warehouse building, UNICOR, common use building such as chapel, auditorium gymnasium, library, commissary and chow, and others. The scope of this project includes buildings at the site as well as exterior site work both above and underground. The work included in this contract includes but is not to: a. New addressable, automatic and manual fire alarm system for all system for all building on site as shown on the plan. The Contractor will provide detailed shop drawings prepared, sealed and signed by a qualified . b. The new fire alarm system will be monitored and controlled using new UL listed central monitoring and control workstation desktop computer connected to the new fire alarm system network. The Medium Facility Control Room will be the location of the workstation and used as a proprietary monitoring station. Another of UL listed workstation will be will be at the Communication Room, third floor of Administration building. c. Site exterior work includes providing new underground and aboveground pullboxes, trenching and providing concrete encased underground conduit systems. A portion of existing underground conduit systems and existing manholes and pullboxes will be used in the scope of this project. The existing manholes and pullboxes will be connected to the new conduit and pullbox system. d. Excavation, backfill and repair of grade in various condition including but not to dirt/turf, traffic rated concrete and asphalt areas, concrete walkways will be required for the site exterior work. e. Each building on site will be equipped with a dedicated Fire Alarm Control Unit (FACU). A very number of small building will be served by the FACU from adjacent buildings. f. The new fire alarm network will be a Class A system using fiber optic cables. Each building will include a fiber patch panel in a fiber termination unit where the fiber network can be patched in and out. The fiber optic cable loop will be connected from the fiber termination unit for each building to the FACU in each building. g. Each building will be equipped with one or more remote booster power supply (NAC) units for notification appliance circuits. h. Initiating circuits will be Class A. Building will have manual pull stations or automatic smoke detections or combination of both. i. Notification circuit will be Class B. Each building will have complete notification appliance coverage. j. Mechanical units, including roof top units and fan coil units, will be interfaced with fire alarm system for fan shut down. k. All fire sprinkler system risers flow and tamper switches will be interfaced with the fire alarm system. l. Post Indicator Valves (PIV) on the exterior around the site will be interfaced with the fire alarm system when contact is . New underground conduit will be required for PIV locations. m. Programming and configuration of the fire alarm network, central monitoring and control workstation, fire alarm control units and all associated devices and equipment. n. Programming provision should be included to interface with the other facility and site wide fire alarm system o. Testing, and commissioning of the entire system and all associated devices and equipment. p. New 20A, 120V circuit breakers and power branch circuits from existing power panelboards to supply FACU and NAC units in each building. q. While there are some ceiling and side access panels and hatches , the ceiling space is congested with existing utilities in many locations. The roof construction is sloped/pitched for all buildings causing ceiling space to be reduced near exterior walls. Contractor will be responsible for cutting/patching of ceilings and walls will be required to install new conduit and wiring in existing ceiling spaces. r. It is expected that hazardous material, including but not to, lead-based paints and asbestos will be present at the site. Contractor is responsible for avoiding disruptions to the hazardous material where possible. Where disruption is necessary, contractor shall notify Architect and Owner. It is the responsibility of the Contractor to inform the Owner at least 3 weeks ahead of time prior to any work to be performed to avoid delay of construction. Owner will remove hazardous materials under a separate contract. s. Majority of the walls are CMU/Concrete construction which will require core drilled penetrations to run the new conduit system. *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Jails / Prisons
$17,363,249.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 13, 2023
November 13, 2023
3901 Klein Blvd, Lompoc, CA
Related To This Project
Lompoc, CA
Bid Date: May 17 2023
Lompoc, CA
Bid Date: May 23 2023
Lompoc, CA
Bid Date: Dec 19 2019
Lompoc, CA
Bid Date: Jun 01 2023
Lompoc, CA
Bid Date: Feb 17 2021
Lompoc, CA
--
Lompoc, CA
Bid Date: Aug 24 2023
Lompoc, CA
Bid Date: Aug 31 2023
Lompoc, CA
Bid Date: Apr 12 2023
Lompoc, CA
Bid Date: Apr 04 2023
Lompoc, CA
Bid Date: May 10 2023
Lompoc, CA
Bid Date: Feb 23 2023
Lompoc, CA
Bid Date: Mar 01 2023
Lompoc, CA
Bid Date: Jun 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.