Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 29, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a retail development in Elizabethton, Tennessee. Completed plans call for the renovation of a retail development.

518 E. Elk Avenue Façade Improvements : Create two (2) separate facades. Remove all glass, metal framing, and door. Remove vinyl soffit. Install wood framing, stain grade wood trim, window, 2 new double doors. Install stain grade wood trim and soffit. Stain all new wood trim interior and exterior. Pressure wash and paint stucco above lower roof. Repair stucco as needed Completion- 90 days ; Liquidated damages will be assessed at $100 a day.

Award

Retail

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
91
Bidding Soon
1,206
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2023

May 24, 2023

Project location map

518 E Elk Ave, Elizabethton, TN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed