BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Carpentersville, Illinois. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

The proposed improvements will consist of, culvert replacements at Golfview Lane that includes the removal and installation of approximately 60 of 48 W x 36 H concrete box culvert and associated drainage structures and culvert replacements at Williams Road of approximately 43 of 24 concrete pipe restoration, and all other ancillary work required to complete the project in accordance with the plans, specifications and all other applicable standards. A Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total proposal shall be submitted with each proposal as provided in Article 102.09 of the Standard Specifications for Road and Bridge Construction, prepared by the Illinois Department of Transportation. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. The awarding authority reserves the right to waive technicalities and to reject any or all proposals as provided in Article 102.08 of the Standard Specifications for Road and Bridge Construction, prepared by the Illinois Department of Transportation. The Village of Carpentersville is an equal opportunity employer.

Post-Bid

Bridges / Tunnels

$200,000.00

Public - City

Site Work

13

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
101
Bidding Soon
2,116
All Active Projects
902
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2023

May 19, 2023

img_map_placeholder

Multiple Locations, Carpentersville, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.