BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Remodeling of an educational facility in Rocklin, California. Completed plans call for the remodel of a educational facility.

This project is for remodeling LRC 432, 434, and 435 into one large office space for the Sierra College Marketing team. The total area is 1865 square feet. This project involves electrical, data, and communication work, as well as framing, carpeting, and wall coverings. Deadline to submit Questions Apr 13th 2023, 2:00 PM PDT Substantial completion of work must be achieved by July 20, 2023 The project will consist of the following: Demo approximately 120'x 10' of existing wall coverings Removal and disposal of all whiteboards and built-in casework. Per jamb and header spec given rough openings for (two) flush doors with adjacent windows in the wall that divides 434 and 435 from LRC 432. Relocate existing data, power, and possibly other utilities in the wall between LRC 432 and 435,434. Construct a new wall in LRC 434 that will be framed up to the existing partial wall and install one door. If the existing wall is not braced to the hard deck with kickers, add kickers per the details. Supply and install a new door and frame at the existing blocked-off door from the hallway to 434 Install and level 2 owner-furnished mounts for monitors. Protect and adjust the acoustical ceiling if needed. Where existing wall coverings are demoed, install 5/8" drywall and tape and texture Each room is to be individually zoned for lighting refer to lighting plan. New rooms created by this remodel must have supply and returns for HVAC Full interior painting and patching of existing walls o All new drywall work must be primed with two coats of PVA o All wall coverings, new and existing, shall receive a minimum of two coats The project is slated to begin on June 19, 2023, and is to be completed by July 20, 2023

Bid Results

Educational

$136,600.00

Public - County

Remodeling

6

4

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
69
Bidding Soon
1,297
All Active Projects
532
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2023

June 19, 2023

img_map_placeholder

5000 Rocklin Rd, Rocklin, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.