BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Minneapolis, Minnesota. Completed plans call for the renovation of a educational facility.

**As of May 30, 2023, project was awarded to Dunham Associates, Inc. but awarded amount is not available.** Deadline for RFP Questions April 18, 2023 at Noon Respondents will prepare and submit as part of their Proposal, the Targeted Business (TGB) & Community Economic Development Questionnaire that is available to download and submit from the SmartCOMP tool. A Pre-Proposal Meeting has been scheduled for the date and time noted in section 2.1 of this RFP. Attendance at this Pre-Proposal Meeting is Mandatory for prime firms that are interested in responding to this RFP. The University will not accept Proposals from Respondents that are not listed on the Pre-Proposal Meeting Sign-in Sheet that is made available after the meeting via addenda. 1.0 PROJECT INFORMATION 1.1 Background The Board of Regents of the University of Minnesota (the "University") is requesting Proposals to provide professional design services for replacement of switch gear in Keller Hall, located on the east bank of Twin Cities campus (the "Project"). 1.2 Project Description (the "Work") The 13.8KV electrical switch gear located in Keller Hall has been failing. The rated air insulated switch gear at the Keller Hall Building is beyond its useful life. The University, in conjunction with Energy Management, would like to renew and replace the 13.8KV electrical equipment and switch gear. The University seeks the engineering services of an AE Team, led by an Electrical Engineer, who will: 1. Review existing records, plans, drawings, and any other improvements/additions that may have been added in the life of the existing electrical equipment and associated building systems at Keller. 2. Design replacement switch gear and all associated equipment. 3. Provide Schematic Design, including construction and replacement estimates, that will be used to procure the services of a Construction Manager at Risk (CMAR) 4. Work with the CMAR to complete Design Development (DD) documentation and detailed phasing plan for switch gear and associated equipment replacement, including long lead items procurement. The DD documentation will also provide the project Guaranteed Maximum Price (GMP) for the CMAR 5. Complete Construction Documents (CD) that will document the phasing plan to minimize building electrical outages. 6. Work closely with the CMAR during construction, installation, and Construction Administration Phase, per the developed phasing plan of replacements, taking into consideration an occupied building while working closely with Facilities Management. 7. Work closely with the University's Electrical Utilities group to conduct commissioning. Note commissioning plans will not be required. Please NOTE: o All work inside the electric vault must be coordinated with the University of Minnesota Electric Utilities Group. o All shielded 13.8kV cables shall be provided and installed by University of Minnesota Electric Utilities. Unshielded conductors, use for connections between adjacent switchgear bays, shall be provided and installed by the contractor. All cable costs, both shielded and unshielded, shall be included in the budget estimate. o This Project is in an occupied building which means phasing of replacement as well as long lead procurement of equipment will be critical

Award

Educational

Public - State/Provincial

Renovation

6

7

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
46
Bidding Soon
789
All Active Projects
342
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

May 17, 2023

img_map_placeholder

200 Union St SE, Minneapolis, MN

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.