BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Site work and paving for a road / highway in Henderson, Nevada. Design plans call for site work for a road / highway; and for paving for a road / highway.

Plans call for the reconstruction of the Henderson Interchange to increase traffic capacity and reduce travel delays in the vicinity of the interchange of Interstate 11 (I-11), Interstate 215 (I-215), Lake Mead Parkway (SR 564), and the surrounding freeway ramps. As of March 13, 2026, the project is in design. The previous design-build method has been cancelled and has switched to a design-bid-build method after bids came in too high. The project is expected to bid publicly to contractors, but a bidding timeline has not been disclosed. Construction is expected to begin in late 2027 to early 2028. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The closed solicitation has been provided below for reference: DBE GOAL: 9.4% The Project will provide design and construction for reconstruction of the Henderson Interchange with project limits from the Valle Verde Drive service interchange with I-215 at the west to the Van Wagenen Street intersection with Lake Mead Parkway at the east; and from the Horizon Drive service interchange with I-11 at the south to the Galleria Drive service interchange with I-515 at the north. Currently, the Department anticipates a Contract amount of $350-$400 million. An Environmental Assessment was completed in 2022 with a Finding of No Significant Impact (FONSI) signed October 11, 2022. The Department's website for this project that contains supporting documents can be found at:website. The Project elements may include professional services for survey, geotechnical engineering, civil engineering, landscape architecture; and construction of roadway, bridge, retaining wall, grading, drainage, signals, lighting, ITS improvements, landscape and aesthetics, utility and railroad coordination, and maintenance of traffic during construction. Please refer to the RFQ for complete qualification and proposal requirements. NC DOT - RFQ D/B - Henderson Interchange Design-Build Project

Design

Roads / Highways

$520,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
25
Bidding Soon
402
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2024

January 1, 2028

Project location map

E Van Wagenen St, Henderson, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.