BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2024 at 8:00 PM

Updated October 7, 2025

Site work and paving for a sidewalk / parking lot in Midlothian, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of May 2, 2024 , project was awarded to J Squared Construction but awarded amount is not available. The Owner reserves the right to reject any and all proposals and to waive any irregularities in the Competitive Sealed Proposal process. No proposal shall be withdrawn within 30 days after the proposal opening without the specific consent of the Owner. PROPOSAL BOND: Not Applicable PAYMENT BOND AND PERFORMANCE BOND: A Payment Bond and Performance Bond, each in an amount equal to 100 percent (100%) of the Contract Sum conditioned upon the faithful performance of the Contract will be required. Please note that all bonding companies presented must be acceptable to the Owner. The prevailing rates of wages are the minimums that must be paid in conformance with all applicable laws of the State of Texas All Offerors submitting a proposal are encouraged to attend the proposal opening. Subcontractors and suppliers intending to submit proposals to Construction Offerors are required to prepare their proposals based on a complete set of proposal documents. If after reviewing the complete set of proposal documents, Subcontractors and supplier Offerors desire to purchase individual drawings and specification sections for their proposal convenience, they may do so by ordering the specific drawings and specifications directly from the reproduction company. All Offerors submitting a proposal are encouraged to visit the site. Proposers shall submit questions about the Proposal Documents to the MISD Purchasing Department in writing by the date identified in the proposal. Replies will be issued to proposers as an addendum to the Proposal Documents and shall become a part of the Contract. The Owner will not be responsible for oral clarification. - Submit all questions to: Shana Volentine Midlothian ISD Purchasing Coordinator Email: shana.volentine@misd.gs

Occupancy

Sidewalks / Parking Lot

$600,000.00

Public - City

Paving, Site Work

48

12

6

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
344
Active Projects
47
Bidding Soon
4,084
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

May 26, 2023

Project location map

333 Church St, Midlothian, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.