BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Norwalk, Iowa. Completed plans call for site work for a water / sewer project; for paving for a road / highway; and road / highway.

Construct Wright Road Water Main Replacement project including all labor, materials and equipment necessary to construct approximately 7,920 linear feet of 12-inch water main by open cut, 1,000 linear feet of 12-inch water main by trenchless construction, hydrants, valves, fittings, connections to the existing system, service reconnections, traffic control, pavement removal and replacement, surface restoration, erosion control and miscellaneous associated work, including cleanup. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the City of Norwalk, for the faithful performance of the contract, in an amount equal to 100% of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC The Certified Check, Certified Share Draft or Cashier's Check may be cashed, or the Bid Bond forfeited, and the proceeds retained as liquidated damages if the bidder fails to execute a contract or file acceptable performance bonds or provide an acceptable certificate of insurance within ten (10) days after the acceptance of his proposal by resolution of the City. Each successful bidder will be required to furnish a corporate surety bond in an amount equal to 100% of its contract price. All work on the project except surface restoration not completed in the fall seeding period shall be completed by November 17, 2023. All remaining final surface restoration of areas stabilized with erosion control hydromulching shall be completed by April 15, 2024. Failure to complete the work under the specified schedule will result in liquidated damages of $500.00 per day until the project is complete. All work on the project except surface restoration not completed in the fall seeding period shall be completed by November 17, 2023. All remaining final surface restoration of areas stabilized with erosion control hydromulching shall be completed by April 15, 2024. Failure to complete the work under the specified schedule will result in liquidated damages of $500.00 per day until the project is complete.

Bid Results

Water / Sewer

$1,506,980.00

Public - City

Paving, Site Work

25

3

2

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
37
Bidding Soon
553
All Active Projects
233
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.