BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Winter Haven, Florida. Completed plans call for site work for a water / sewer project.

As of July 11, 2023, the project has been awarded. A timeline for construction has not been confirmed. Scope of Work: Provide and pay for surveying services for the Project. 1. Survey work required in execution of the Project. 2. Civil, structural or other professional engineering services specified or required to execute Contractor's construction methods. 3. The method of field staking for the construction of the work shall be at the option of the Contractor. 4. The accuracy of any method of staking shall be the responsibility of the Contractor. All surveying for vertical and horizontal control shall be the responsibility of the Contractor. 5. The Contractor shall be held responsible for the preservation of all stakes and marks. If any stakes or marks are carelessly or willfully disturbed by the Contractor, the Contractor shall not proceed with any work until he has established such points and marks lines and elevations as may be necessary for the execution of the work. 6. The Contractor shall retain the services of a registered land surveyor licensed in the State of Florida to identify existing control points and maintain a survey during construction and for record drawing purposes. 7. All temporary survey markers to be removed at completion of the project Question Deadline 05/09/2023 at 2:00 PM ET a. Lake Howard Gravity Sewer Improvements - replacing the existing 15" gravity sewer along Lake Howard Drive, Avenue D, and Avenue E with a new 18" PVC gravity sewer. Along Bates Avenue a new 8" gravity sewer will be installed. New manholes and sewer laterals will be installed. The existing gravity sewer system will be removed once the new system is cleared for use. b. AC Force Main Replacement - this project replaces an existing 6" AC force main with a new 6" PVC force main. The existing 6" AC force main will be placed out of service by grouting it in place. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Water / Sewer

$1,917,215.00

Public - City

Site Work

39

13

2

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
68
Bidding Soon
1,450
All Active Projects
591
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2023

July 17, 2023

img_map_placeholder

To Be Determined, Winter Haven, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.