BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Garber, Oklahoma. Completed plans call for the renovation of an educational facility.

The following is a summary of the scope of work required for the roofing project. This summary is listed to state the basic requirements for the roofing system to be bid. 1. Clean and repair existing R-panel roofing prior to placing new membrane. Fill prepped area with new insulation and provide new membrane over insulation, mechanically attached. 2. Provide all factory manufactured flashing & appurtenances, parapet wall treatments, and carpentry and materials required. 3. Add flashing, gutters and downspouts as shown on plan, or as required to provide positive drainage off the roof. Provide new slope in existing roof with tapered insulation to slope to gutters as required. Clean, maintain and repair existing roof gutters and downspouts. Resecure loose support straps. Remove all debris from roof. 4. Disconnect, move and reinstall mechanical equipment and utility service lines on raised support system as necessary. Install new curbs at mechanical equipment. Equipment shall be 8" to 12" minimum above finished roof, unless approved otherwise by the manufacturer and Architect. 5. Strictly adhere to manufacturer's recommended installation methods and instructions. 6. The existing roof has slope built into the structure. Verify existing conditions affecting roof slope and drainage and make modifications necessary to provide positive drainage (1/8" per foot) off structure by building up slope with insulation as required. All water shall have a direct path to roof drains, roof edges, scuppers or gutters. Ponding of water will not be accepted. Ponding water must be acceptable under manufacturer's warranty, and cannot be an exclusion to the warranty. Contractor shall conduct flood test of roof upon completion of work for Architect's inspection/approval. 7. Replace existing galvanized metal caps, gravel stops, scuppers, fascias and metal flashings with new material, at same locations and at same height elevations as required. Reuse existing material where practical, and only where approved by Architect. Provide new material to match existing as required. Match new work to existing. Paint to match existing. 8. Provide new flashings, pitch pans, roof accessories, etc. Dispose of old materials and debris at legal dump site. Installation of new board and membrane shall provide a UL 90 wind rating. Fasteners shall penetrate thru existing roofing membranes and thru existing deck. Fasteners shall be in accordance with manufacturer's requirements to meet UL 90 wind rating. 9. Clean and repair existing roof prior to placing new membrane. New roofing membrane and system shall be applied over cleaned exposed (existing) surfaces. Provide new flashings, pitch pans, roof accessories, etc. Dispose of old materials and debris at legal dump site. 10. Remove loose, deteriorated coatings and mastics from inside face of perimeter walls and parapets. All inside parapet walls shall be covered with new roof membrane system per manufacturer's written instructions and specifications. 11. Recaulk all deteriorated coping stone joints prior to covering with new material. 12. Remove old deteriorated caulking. Recaulk with Reglet Joint Sealant. 13. Provide and install new walkway pads on roof from ladder access area to, between and around all mechanical and electrical equipment. Install per manufacturer's installation instructions, solidly secured to roof. Mark ladder access points on top of wall. 14. Strictly adhere to manufacturer's recommended installation methods and instructions. 15. Install new single ply thermoplastic membrane roof system and appurtenances as specified and/or required. Install new manufactured flashings. 16. Wrap all existing ductwork and metal work exposed on roof where exposed, with new thermoplastic system. 17. Rescrew, seal, cover, wrap, and do all items necessary to completely seal all roof top mounted mechanical units and items of equipment. Replace all damaged items with new items. All equipment shall be covered by 2 year Contractor's warranty to be leak free during warranty period. 18. Reconnect all deteriorated or broken electrical conduit. Repair/replace all loose and/or damaged connections. 19. Provide new expansion joints at the same locations as the existing expansion joints. 20. Existing improvements on the roofs shall remain in tact. Protect from damage. 21. All items which penetrate the roof and do not have an 8" roof curb height (minimum) shall be reconstructed as required to provide a new 8" to 12" minimum roof curb. Items which are impossible to raise require a variance from the Architect and Manufacturer. 22. Delete all wood supports at gas pipe and conduit supports. Provide new lexan (polycarbonate) roof pipe stands as manufactured by Miro Industries, 800 768- 6978, or approved equal, in lieu of redwood supports, size and type as recommended by manufacturer. Secure supports to roof to prevent removal or blowing off roof.

Award

Educational

$97,500.00

Public - City

Renovation

7

7

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
42
Bidding Soon
604
All Active Projects
249
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 27, 2023

May 29, 2023

img_map_placeholder

108 W Garber Rd, Garber, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.