Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Wheaton, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; road / highway; and water / sewer project.

Various locations Throughout the Village of Winfield. 7,500LF (1.44 MI) Grind / Overlay: Sunny Avenue, Church Street, Beecher Avenue, High Lake Road. Overlay: Beecher Avenue, Purity Drive, Public Works. Curb & Gutter and Sidewalk Replacement, Pavement Markings, Restoration, and Storm Sewer Repairs.

Post-Bid

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

18

3

2

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
552
Active Projects
282
Bidding Soon
3,799
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2023

June 26, 2023

Project location map

Multiple Locations, Wheaton, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed