BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Roanoke, Virginia. Completed plans call for the renovation of a educational facility.

Project Description: 1.1 Base Bid 1: Plaza Entry as Defined by Boundary on Drawings L-100 will be renovated to: 1.1.1 Repair/replace current pavers and stamped concrete. 1.1.2 Renovate Landscaping. 1.1.3 Repair first (1st) floor roof waterproofing. Roof must be inspected by A/E prior to covering up with pavers. 1.1.4 Renovate lighting. 1.1.5 Provide bike rack and bench shelter. 1.2 Additive Bid A: Plaza North as Defined by Boundary on Drawings L-100 will be renovated to: 1.2.1 Renovate Landscaping. 1.2.2 Install new Silva Cell Tree Planter. 1.2.3 Add lighting to existing foundation. 1.3 Additive Bid B: Plaza South as Defined by Boundary on Drawings L-100 will be renovated to: 1.3.1 Repair/replace current pavers. 1.3.2 Renovate landscaping. 1.4 Additive Bid C: Crosswalk connection as Defined by Boundary on Drawings L-100. 1.4.1 Provide new crosswalk connection across Jordan Alley. 1.4.2 Matching pavers to entry way to Main Building. Area approximate size is 10' x 10'. 2. Contractor responsibilities: 2.1 Contractor to verify all benchmark locations as indicated on Plans. Contractor shall locate additional protected, permanent benchmark locations as necessary. 2.2 Contractor is responsible for the coordination and sequencing of demolition as described by these documents and specifications as indicated in the Project Drawings. 2.3 Any drainage structures shall be constructed in accordance with the Virginia Department of Transportation design standards. 2.4 Underground facilities, structures, and utilities have been plotted from available surveys and records and therefore their location must be considered approximate only. There may be others, the existence of which is presently not known. Contractor shall locate and protect all utilities at his own initiative and expense. 2.5 Contractor shall be responsible to immediately repair any active utilities damaged during construction and to notify the owner's representative and any appropriate utility companies of the damage. 2.6 All material generated by the demolition shall be hauled from the site and disposed of per City of Roanoke regulations. 2.7 The contractor shall coordinate finished pavement grades with elevations and locations of existing roads and streets. 2.8 Other work (grading, excavating, and construction) on the project shall not commence until the appropriated erosion and sediment control measures are in place as specified on the plan. 2.9 The contractor shall be responsible for obtaining all necessary permits and licenses required by the State of Virginia, VDOT, City of Roanoke, or any other governing agencies involved under this contract. 2.10 Appropriate fencing and/or barricades shall be used when demolition occurs near pedestrian walkways, any sidewalk, entrance, and/or street closures to be coordinated with the Cite of Roanoke and Roanoke Higher Education Center. 2.11 Lengths of lines indicated on the drawings for utility systems are approximate only. It shall be the contractor's responsibility for determining the exact amount of piping required to furnish a complete working system in accordance with the intent of the drawings. 2.12 Top of inlets shown are approximate only. Contractor shall verify exact elevations required to assure structure height complies with the purpose of the structure and conforms to adjacent finished grades. 2.13 Provide positive drainage at all graded areas. 2.14 Limits of disturbance shall be contained within the existing property limits on plans unless otherwise shown. 2.15 Contractor shall notify A/E of any discrepancies between the drawings and specifications and between the contract documents and in-field conditions. Interested parties may submit written questions on any aspect of this IFB on or before 3:00 p.m., April 27, 2023. Please submit your questions to Jeremiah McMillian, by email: jeremiah.mcmillian@education.edu. No other questions will be responded to after the April 19, 2023, deadline. Questions and answers will be posted no later than May 1, 2023 on the RHEA website

Award

Educational

$380,000.00

Public - City

Renovation

15

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
42
Bidding Soon
649
All Active Projects
339
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 24, 2023

July 31, 2023

img_map_placeholder

108 N Jefferson St, Roanoke, VA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.