BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Jonesboro, Arkansas. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

The new Art & Innovation facility is a steel framed structure to house spaces supporting learning and creative activities for Art & Design as well as Engineering and Computer Sciences at ASU. Comprised primarily of studio spaces, the building will also feature a slopped floor lecture classroom, printing / fabrication workshop, computer classrooms, faculty offices, and a café space. Substantial use of high-performance glazing with low iron glass (both exterior and interior) will enhance use of daylighting and encourage visual awareness and collaboration of creative endeavors throughout the building. The total heated and cooled space is anticipated to be approximately 43,000 GSF. The building will be located on the east side of the main pedestrian access through the campus, and immediately south of the existing Fine Arts building, on land currently used for paved parking Exterior landscaping and hardscape are anticipated to be an important attribute of the project, with some studio spaces incorporating operable walls opening directly onto garden or plaza areas. In addition, the existing pedestrian access running east / west along the south face of the existing Fine Arts building, linking the Windgate 3D Arts Building with the center of campus, will be improved and enhanced. Interior spaces will, over-all, have a utilitarian / industrial aesthetic, with finished concrete floors and exposed structure and MEP systems in most areas, however, acoustic considerations are very important and quiet HVAC systems components are required to maintain suitable low noise floor levels for instruction and learning. The building will be connected to the campus chilled water loop for airconditioning and will utilize boilers located withing the building for hot water generation. The estimated cost of construction is 17 million, with anticipation construction starting February 2024, and completed by July 2026.

Post-Bid

Educational

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
22
Bidding Soon
372
All Active Projects
134
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2023

February 1, 2024

img_map_placeholder

2713 Pawnee St, Jonesboro, AR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.