BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Enid, Oklahoma. Completed plans call for site work for a water / sewer project.

Reference Number:0000317220 Taylor Massey 580-616-7247 tmassey@enid.org - Insurance Required - Statutory :100 % The project is to repair compromised areas of the North Boggy Creek storm sewer pipe. The repairs will be in areas of the pipe that is on Elm Avenue from North 3rd Street to North Van Buren Street. Contact Information Angela Rasmuson 580-616-7242 arasmuson@enid.org Taylor Massey 580-616-7247 tmassey@enid.org Question Deadline May 01, 2023 at 5:00 PM The Owner intends to award a contract to repair North Boggy Creek storm sewer line from N. Third St. N. Van Buren St. on West Elem Ave. in the City of Enid. - F-2303C project. The work shall encompass the reparing of RCC Box in line one and repairing of egg-shaped Brick masonry storm sewer from line 2 to line 8. It has limited access locations. It is contractor's responsibility to make arrangements and safety of workers since it is under ground closed storm sewer line. The items included in this construction are as follows: 1. Reinforced Concrete Box Storm sewer. 5 -6-ft height x 7.5' ft span reinforced concrete box shaped a. existing storm sewer line at line one need repairs to improve stability functioning of storm sewer line. Repairs are clarified in to 3 conditions. Some areas rebars are exposed and rusted: Clean damaged concrete and rusted rebar. As per specification and drawing attached. Follow the construction method shown in 521.04-D-(2) (ODOT Specification SECTION 521- PNEUMATICALLY APPLIED MORTAR). Repairs are graded as 4 in attached repair locations b. Concrete Scaling Repair: Chip loose concrete until solid, clean with wire wheel, blow clean and Prepare and apply the Mortal as per the Follow the construction method given 521.04-D-(2). Repairs are graded as 3 in attached repair locations 2. a. Brick masonry joints repair: clean brick Masonry damaged area. Clean minimum 1" deep in to brick joints. Apply mortar as per the section 521.04. Repairs are graded as 3 in attached repair locations b. Brick masonry damaged area repair. Repair damaged places, Pipe intrusion, Missing brick areas, Cracks in bricks, cracked mortar, as per the specifications attaching using Pneumatically applied mortar. (ODOTSECTION 521-PNEUMATICALLY APPLIED MORTAR. Repairs are graded as 4 in attached repair locations

Bid Results

Water / Sewer

$323,750.00

Public - City

Site Work

8

5

6

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
39
Bidding Soon
369
All Active Projects
165
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2023

June 14, 2023

img_map_placeholder

E Elm Ave, Enid, OK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.