BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Sacramento, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of June 30, 2023, the project has been awarded. A timeline for construction has not been confirmed. The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County. The project consists of constructing a new paved parking area totaling approximately 35 acres within the SMF boundaries and will add approximately 2800 economy spaces and approximately 450 free waiting space, to include lighting and bus shelters. Located east of Airport Boulevard between Crossfield Road and Interstate 5 with access by the new Elkhorn Boulevard extension and will be made available to the public and utilized by Transportation Network Company (TNC) vehicle. Question Deadline Question Deadline 06/05/2023 at 5:00 PM PT PROJECT BACKGROUND AND SCOPE OF WORK The scope of this project consists of constructing two lighted parking lots. One lot will be a TNC & Free Waiting Lot, located south of AMPM, east of Airport Blvd., north of I-5, and west of proposed W. Elkhorn Blvd. The second lot will be a new economy lot located east of proposed W. Elkhorn Blvd., north of I-5, and south of East Economy Lot. The new economy lot will connect to Meister Road (aka East Economy Lot entrance). Scope of work includes clearing and grubbing, importing soil, embankment construction, paving, striping, marking, lighting, future electric vehicle charging infrastructure, future telecom infrastructure, future bus access control system, and bus shelters. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Sidewalks / Parking Lot

$20,342,297.00

Public - County

Paving, Site Work

66

20

61

5

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
81
Bidding Soon
1,514
All Active Projects
627
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2023

August 28, 2023

img_map_placeholder

To Be Determined, Sacramento, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.