Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2023 at 8:00 PM

Updated January 26, 2024

Demolition and site work for a municipal facility in Clinton, Missouri. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

Demolition of Structures - It is the intent of these specifications to describe demolition and removal ofthe structures, two (2) trees at the back of the garage and site clean-up ofthe county-owned property located at 414 East Augusta Street, St. Joseph, MO. Site map attached. Demolition and removal of all structures shall include: Removal ofidentified structure(s): house, garage, wooden fence, chain link fence, fire pit, and two trees at the back ofthe garage (including entire root ball) and all contents in their entirety All concrete floor slabs, foundations, pits, pilings, porches, steps and all other above ground and underground improvements associated with the structure(s) shall be removed from site; no debris of any kind shall be buried on site Any all-weather, impervious surfaces including asphalt, concrete or gravel shall be removed from the site Cap all building sewer connections at street connection Any/all septic tanks shall be pumped, and the contents disposed ofin accordance with appropriate ordinances and regulations; tank shall be filled, and the top of the tank crushed. Contractor is required to contact all utilities to ensure that they are discomiected prior to starting the demolition; also, the contractor must contact Dig-Rite or other entities responsible for marking of all utility services Required demolition permit shall be obtained from the City of St. Joseph; this permit should be issued at no charge It is anticipated that work may start after May 10, 2023 and must be completed within 30 calendar days; County will let successful vendor know when project can begin Question Deadline 04/20/2023 Information / Clarification shall be submitted in writing by Email. If any Bidder is in doubt regarding any part ofthe Bid Documents, or finds discrepancies in or omission from any part ofthe Bid Documents, he may submit to the Presiding Commissioner a request for an interpretation or correction thereof not later than five (5) working days before the bids are scheduled to be opened.

Award

Municipal

$17,000.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

May 10, 2023

Project location map

414 E Augusta St, Clinton, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed