Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 4, 2023

May 30, 2023

November 21, 2023

Bid Results

Playgrounds / Parks / Athletic Fields

$557,406.00

Public - City

Demolition, Paving, Site Work

img_map_placeholder

317 E Carson St, Pittsburgh, PA

48

13

4

Subscribe to View Full Documents

Demolition, site work and paving for a playground / park / athletic field in Pittsburgh, Pennsylvania. Completed plans call for the demolition of a playground / park / athletic field; for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

Bids must be accompanied by a certified check upon a National or State bank, drawn and made payable without condition to the Pittsburgh Parks Conservancy in an amount not less than ten percent (10%) of the bid, or a bid bond of not less than 10%. Base Bid Work includes but is not limited to: Demolition of site features, erosion and sedimentation controls, tree protection fence and construction fence, traffic control, earthwork and fine grading, asphalt paving, concrete paving, site electrical and lighting, topsoil and seeding, tree planting. Demolition of existing asphalt pathways will be done by City of Pittsburgh Department of Public Works. Alternate Work includes the following: Alternate 1: Arch Street Median and Pedestrian Crossing, consisting of work within the roadway/right-of-way, curbs, sidewalks, traffic control, traffic markings and planting. Alternate 2: Segment C of Allegheny Commons, consisting of installation of erosion and sedimentation controls, tree protection fence and construction fence, traffic control, earthwork and fine grading, asphalt paving, concrete paving, site electrical and lighting, site furniture, topsoil, seeding and tree planting. Alternate 3: Metal Pipe Rail on the west side of Federal Street and section on the south side of North Avenue, consisting of fabrication, painting, installation of metal pipe rail and concrete border installation. Alternate 4: Metal Pipe Rail on the east and west sides of Arch Street, consisting of fabrication, painting, installation of metal pipe rail and concrete border installation. Alternate 5: Metal Pipe Rail on North Avenue and Arch Street - north and south of Washington Monument, consisting of fabrication, painting, installation of metal pipe rail and concrete border installation. The successful bidder will be required to submit a 100% performance bond, a 100% labor and materials payment bond and a 10% maintenance bond. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. Insurance in a form acceptable to Owner will be required of the successful Bidder. All questions must be submitted via email to Joe Hackett, hackett@lba-la.com, with "Allegheny Commons North Promenade Rehabilitation Segment B Construction Project" clearly indicated in the subject line. No questions will be received or responded to by phone. All questions must be submitted prior to Thursday April 20, 2023. No questions will be addressed after that date and time. All registered bidders will receive a copy of all submitted questions/answers on Friday April 20, 2023. A copy of the Bid Documents will be available for review at the office of LaQuatra Bonci Associates, 95 South Tenth Street, Pittsburgh, PA 15203 during regular business hours. E-mail Joe Hackett, hackett@lba-la.com to make an appointment to view the documents. The Owner of the Project is The Pittsburgh Parks Conservancy (PPC) on behalf of the City of Pittsburgh. Consideration will be given to bids received from qualified bidders that perform quality work for the lowest responsible price. The PPC reserves the right to accept or reject any or all Bids, or any part of a Bid, and to waive informalities, and to award the Bid in the best interest of the Pittsburgh Parks Conservancy. No Bid may be withdrawn for sixty (60) days following the scheduled closing time for the receipt of Bids.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Starting At

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Don't miss Bidding Projects!

Within 75 Miles of this Project:
287
Active Projects
154
Bidding Soon

Related Projects


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.