BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Purcellville, Virginia. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

With an overall vision of a contiguous, multi-use path around the Town of Purcellville that will give pedestrians, cyclists, and those using other non-motorized vehicles a safe corridor to travel through Town without a vehicle, we propose to construct a missing link of pathway along SR690/N 21st Street between Hirst Road and the Suzanne Kane Nature Preserve. This portion of multi-use trail is Phase 1, with Phase 2 intended to continue to the W&OD Trail. (see Exhibits 1 & 2 for maps showing the location of the proposed project). As noted, this path will connect to the W&OD Regional Trail, allowing those who use that trail to easily and safely access businesses and attractions in Town. The proposed project helps achieve this goal and makes the following connections from Hirst Road: OPERATING IMPACT: Maintenance costs would be associated with mowing, snow removal during the estimated 20 year useful luzanne Kane Nature Preserve & Trail W&OD Trail To the neighborhoods of Old Dominion Valley, Catoctin Meadows, Branbury Glen, Purcellville Green, Mayfair Residential Subdivision SR690 Interchange on the Route 7 bypass Purcellville Train Station Historic downtown Purcellville Park and Ride proposed at Fields Farm Park Hirst Road Multi-use Trail (a current Town capital project) This project is included in the city’s 2024-2028 Capital Improvement Plan. As of March 15, 2024, per owner, the town has conceptual plans. A design team has been identified. General contractor anticipated to bid in Spring 2026. The project is anticipated to be constructed 2026-2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Roads / Highways

$1,143,318.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
67
Bidding Soon
1,929
All Active Projects
808
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

img_map_placeholder

N 21st St, Purcellville, VA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.