BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Purcellville, Virginia. Conceptual plans call for site work for a playground / park / athletic field; and water / sewer project.

This proposal is to replace the existing asphalt warning track in its entirety and the outfield fence at Fireman’s Field Baseball Park. During the significant upgrades to the park in 1996, prior to the first Babe Ruth World Series, the old asphalt warning track surface received a thin overly with a composite material comprised of recycled tires and a binder. Forward now 25 years and the condition of the current warning track is very poor. Numerous areas are worn, torn, or broken in such a manner that causes a significant trip hazard for players. In addition, the existing material used does not allow for the necessary drainage of surface water when it rains. This results in regular flooding of portions of the field, particularly near home plate. This project will improve the drainage for the field to enable games to be played when normally they would be cancelled. The existing outfield fence has been damaged over the years by fallen tree limbs and wind. Currently, portions of the fence are being propped up by temporary supports to maintain its integrity to allow for ball games to be played. The useful life of this project is expected to be 15-20 years. This project is dependent upon the receipt of funding from Loudoun County. This project is included in the city’s 2023-2027 Capital Improvement Plan. As of March 15, 2024, per owner, this project does not show funding until FY26 and even then the funding source has not been identified. Therefore this project has not yet begun. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Playgrounds / Parks / Athletic Fields

$280,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
80
Bidding Soon
1,902
All Active Projects
763
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

img_map_placeholder

250 S. Nursery Ave., Purcellville, VA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.