Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Staunton, Virginia. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of June 15, 2023, a design/build contractor has been awarded. Construction is estimated to start in Fall 2023 and be completed in Summer 2027. ------------------ The purpose of this project is to address existing and future capacity needs along I-81 northbound and southbound between mile marker 221.45 and 225.6 in Augusta County near Staunton. The project maintains roadway and bridge safety features, improves operational safety by adding I-81 capacity, improves travel reliability for the public, limits impacts to existing access ramps, and repairs or replaces deficient bridge components within the project. Specific improvements include: - Addition of one lane in the northbound direction of I-81 from the Route 250 (Jefferson Highway) on-ramp at exit 222 to the Route 262 (Woodrow Wilson Parkway) off-ramp at exit 225. - Addition of one lane in the southbound direction of I-81 from Route 262 south at exit 225 to approximately 1,200 feet south of the I-81 bridge over the I-81 southbound / I-64 eastbound ramp. - Widen, replace and/or repair deficient elements of existing bridges within the project limits. - Make sensible use of existing pavement and rights-of-way to accomplish the capacity improvements. - Maintain or enhance operational safety through improvements to signs and pavement markings. This project is part of the Interstate 81 Corridor Improvement Program (CIP), which aims to improve safety, increase reliability and foster economic growth along the 325-mile corridor. The Commonwealth Transportation Board approved the I-81 CIP in December 2018. The $2 billion package of targeted improvements was funded by the Virginia General Assembly and signed into law in spring 2019. More information about the program is available at Improve81.org.
Design
Roads / Highways
$101,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 29, 2023
I-81, Staunton, VA
Related To This Project
Staunton, VA
Bid Date: Aug 08 2023
Staunton, VA
Bid Date: Aug 08 2023
Staunton, VA
Bid Date: Sep 27 2023
Staunton, VA
Bid Date: Sep 30 2023
Staunton, VA
Bid Date: Jan 27 2020
Staunton, VA
Bid Date: Aug 07 2023
Staunton, VA
Bid Date: Nov 30 2021
Staunton, VA
Bid Date: Sep 05 2023
Staunton, VA
Bid Date: Jun 12 2023
Staunton, VA
Bid Date: Jun 30 2023
Staunton, VA
Bid Date: Jun 23 2023
Staunton, VA
--
Staunton, VA
Bid Date: Jun 21 2023
Staunton, VA
Bid Date: Aug 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.