BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a service station / car wash facility in Hesperia, California. Working plans call for site work for a service station / car wash facility.

“The owner has determined a prequalified list of construction managers. A Request for Proposals for CMaR is expected to be released in a future date.” Question Deadline 08/25/2023 at 5:00 PM PT VVTA reserves the right to withdraw or cancel this RFP at any time without prior notice and VVTA makes no representation that any contract will be awarded to a proposer responding to this RFP. CONTRACTOR shall pay for all taxes, except for sales, use, transaction, and excise taxes that were legally enacted at the time CONTRACTOR's offer submitted. CONTRACTOR shall secure and pay for all permits and governmental fees, licenses, and inspections necessary for the proper execution and completion of this Contract. Minimum wage rates for this project have been predetermined by the US Department of Labor (Davis Bacon Act) and the California Secretary of Labor. If there is a difference between the minimum wage rates predetermined by the US Department of Labor and the prevailing wage rates as determined by the California State Secretary of Labor for similar classifications of labor, the Contractor and his subcontractors shall pay not less than the higher wage rate. In accordance with provisions of Section 1773.2 (amended 1977) of the California Labor Code copies of the prevailing rate of per diem wages as determined by the State Director of Industrial Relations and are available at the California Department of Industrial Relations The project will consist of one station located in Hesperia CA. The station will be equipped with three (3) dispensers, two (2) private 350 BAR (H35) dispensers for VVTA's fleet, and a 350 BAR (H35)/700 BAR (H70) dispenser for light duty and heavyduty applications. The station will be designed and built to fuel 60 buses and more than 20 passenger cars per day. The station will include an 18,000-25,000-gallon liquid hydrogen storage tank, and all necessary equipment to operate the station to meet the needs of the agency; liquid hydrogen will be delivered on an as needed basis. The facility is to be constructed on the southern portion of VVTA's property located at the corners of E Avenue and Live Oak Street, just north of the VVTA Hesperia Maintenance and Operations Facility located at 17150 Smoke Tree St. Hesperia, CA 92345.

Final Planning

Service Station / Car Wash

$1,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
90
Bidding Soon
2,096
All Active Projects
947
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2023

April 6, 2024

img_map_placeholder

Multiple Locations, Hesperia, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.