Demolition, site work, renovation and addition to a mixed-use development in Eyota, Minnesota. Completed plans call for the addition of a 26,702-square-foot educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

A. Each Contractor shall supply labor, transportation, material, apparatus, scaffolding and tools necessary for the entire and proper completion of this Work, and each shall install, maintain and remove equipment for the proper execution of this contract, and be responsible for the safe, proper and lawful performance of his equipment, maintenance and use of the same, and shall perform in the best manner, and everything property incidental to, as indicated on the drawings or specifications or reasonably implied in accordance with the Contract Documents. B. When multiple work scopes are bid, each contractor shall provide sufficient manpower, tools and equipment to independently accommodate the construction schedule at each site. C. It is intended that the drawings and technical specifications shall form a guide for the entire work, complete, to be accomplished under this contract. Where an item is not specifically mentioned and is reasonably necessary for the complete work, the Contractor shall furnish and install same under this contract. Should questions or conflicts arise, they must be directed to the Construction Program Manager in writing prior to ordering/delivery or installation/construction of questioned item. D. All sections of Division 00 (Bidding and Contract Requirements) and all sections of Division 01 (General Requirements) shall apply to the Work of each Contract. E. The trade contractor shall take field measurements and field verify conditions with the contract documents before commencing work. Any errors, inconsistencies or omissions shall be reported to the Construction Program Manager. No change orders shall be awarded on account of minor differences between actual field conditions and contract documents. F. In the event that the contractor fails to take corrective action (after 24 hour written notice from the Construction Program Manager) to ensure compliance with safety regulations, the Program Construction Manager shall remedy said situation according to OSHA standards and charge corrective costs to said contractor without further notice to the trade contractor. G. It is the responsibility of each contractor to reference all drawings and specifications to determine their full work scope. There is no agent for the receipt of bids other than the Superintendent of Dover- Eyota Public Schools, Jeremy Fries. Bids shall be submitted on bid form provided by the Bid Documents. The completed bid form shall be submitted without alterations, additions or erasures. Envelopes containing bid must be sealed & marked "Dover Eyota High & Middle School Additions & Renovations" with the name and address of the bidder, the date and hour of the opening and work scope. Each bid of $10,000 or greater shall be accompanied by a certified or cashier's check, or a bid bond in the amount of at least five (5%) percent of the amount of the bid made payable to Dover-Eyota School District NO. 533 as bid security that, if the bid is accepted, the contractor will execute the contract and file the required performance and payment bonds within the allotted time period after notice of award of contract. Board of Education reserves the right to accept or reject any or all bids or parts of bids and waive any formalities or irregularities in the bidding. No bid may be withdrawn for a period of forty-five (45) days after bid opening without consent of the Board of Education. Bid-Results:- 1.WORK SCOPE 01 GENERAL CONSTRUCTION-JD DRIVER-$ 2,757,000 2.WORK SCOPE 02 CAST-IN-PLACE CONCRETE-KOMITT CONCRETE INC-$ 548,750 3.WORK SCOPE 03 PRECAST CONCRETE-WELLS CONCRETE-$ 988,375 4.WORK SCOPE 04 MASONRY-DAROLD BERGER MASONRY-$ 1,010,500 5.WORK SCOPE 05 STRUCTURAL STEEL-CARY SPECIALIZED SERVICES-$ 475,000 6.WORK SCOPE 06 ROOFING-SCHWICKERTS -$ 528,100 7.WORK SCOPE 07 METAL PANELS-SCHWICKERTS-$ 103,420 8.WORK SCOPE 08 ALUMINUM SYSTEMS AND GLAZING-FORD METRO INC-$ 239,645 9.WORK SCOPE 09 STEEL STUD & GYP SYSTEMS-WAGNER CONSTRUCTION COMPANY-$ 287,000 10.WORK SCOPE 10 TILE-BERGER TILE & STONE-$ 221,630 11.WORK SCOPE 11 FLOORING-ARNQUIST CARPETS -$ 652,275 12.WORK SCOPE 12 CEILINGS & ACOUSTICAL TREATMENTS-TWIN CITY ACOUSTICS-$ 440,065 13.WORK SCOPE 13 PAINT-SORENSON-SORENSON PAINTING-$ 198,415 14.WORK SCOPE 14 HVAC PIPING & PLUMBING-NEW LINE MECHANICAL-$ 2,070,000 15.WORK SCOPE 15 HVAC VENTILATION-HARRIS OF ROCHESTER-$ 2,084,000 16.WORK SCOPE 16 SPRINKLER PIPING-SUMMIT FIRE-$ 223,115 17.WORK SCOPE 17 HVAC CONTROLS-WHV-$ 299,526 18.WORK SCOPE 18 ELECTRICAL-R&K ELECTRIC-$ 1,625,000 19.WORK SCOPE 19 DATA SYSTEMS-SIM SOUND-$ 100,909 20.WORK SCOPE 20 DIRT WORK & UTILITIES-VEIT COMPANY-$ 1,239,452 21.WORK SCOPE 21 SITE PAVING-ROCHESTER SAND AND GRAVEL -$ 445,410 22.WORK SCOPE 22 AIR TERMINAL UNIT - SUPPLY ONLY-MIDWEST MEHCANICAL SUPPLY-$ 11,685 23.WORK SCOPE 23 CABINET DISPLACEMENT VENTILATION UNITS - SUPPLY ONLY-MIDWEST MECHANICAL SUPPLY-$ 139,908 24.WORK SCOPE 24 AIR HANDLING UNITS - SUPPLY ONLY-JOHNSON CONTROLS-$ 165,600 25.WORK SCOPE 25 PACKAGED ROOFTOP UNITS - SUPPLY ONLY-TMS JOHNSON -$ 42,440 26.WORK SCOPE 26 CHILLERS - SUPPLY ONLY-SVL-$ 107,310

Bid Results

Educational

$17,028,415.00

Public - City

Addition, Demolition, Renovation, Site Work

173

36

132

3

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
72
Bidding Soon
764
All Active Projects
313
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2023

July 10, 2023

img_map_placeholder

Multiple Locations, Eyota, MN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.