EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 10, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a transportation facility in Ball Ground, Georgia. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Plans and Specifications are for viewing purposes only. In order to bid on the project you must purchase the documents directly from Lead Edge Design Group, Inc. The work generally consists of runway overlay and widening. Bids shall be placed in a sealed envelope marked "Bid for the Runway Overlay and Widening Project" and addressed to the Cherokee County Airport Authority, ATTN: Dick Hall, Chairman, Cherokee County Regional Airport, 1350 Bishop Road, Ball Ground, Georgia 30107. The envelope shall bear the name of the bidder, bidder's address, and any applicable license number. Bid security in the form of a bid bond equal to 5% of the total bid amount is required. In lieu of the bid bond, a cashier's check, certified check, or cash may be accepted. Contract bonds (Performance and Labor & Material Payment) will be required at contract execution, each in the amount of 100% of the Contract amount, provided by sureties authorized to conduct business in the State of Georgia. No bid may be withdrawn after closing time for the receipt of proposals for a period of one hundred twenty (120) calendar days unless that bid is withdrawn per state law. A Notice-of Award for the Contract will be issued once a successful bidder has been determined and funding has been secured. The Sponsor reserves the right to reject any or all bids, to waive informalities, and to re advertise or abandon this solicitation at the Sponsor's sole discretion. Nothing herein shall be construed as a commitment on the part of the Sponsor to award a contract. Bidders are required to submit all questions in writing to arostin@leadedgedesign.com. The deadline for bidder's questions is 5:00 pm on Tuesday, May 2nd, 2023. Payment will be accepted in the form of a check or money order and can be mailed to the Office of the Engineer, Attn: Amanda Rostin. Allow 24 business hours for processing of bidding documents in digital format (pdf), and 72 business hours for processing of a printed set of bidding documents upon the Engineer's receipt of payment. Bidders are required to obtain the bidding documents directly from the Engineer at least 24 business hours prior to the Bid Opening. No bid will be accepted from a bidder whose name is not included on the Engineer's Plan Holders List.

Bid Results

Transportation Terminals

$7,379,650.00

Public - County

Paving, Site Work

79

13

51

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Other Specialties, Flags and Banners, Flags
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Interior Lighting, Special Purpose Lighting, Obstruction Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Concrete Overlays, Fertilizing, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Soil Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
77
Bidding Soon
1,605
All Active Projects
696
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2023

June 8, 2023

img_map_placeholder

1350 Bishop Rd, Ball Ground, GA


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Runway Overlay and Widening

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.