EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 3, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a detention facility in Maurice River, New Jersey. Conceptual plans call for the renovation of a detention facility.

As of September 3, 2024, information regarding the award and award date has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Project is currently out for design and there are no bid documents available at this time. If a firm wishes to participate in the selection process for future projects but is not presently prequalified by the DPMC, the firm should submit a DPMC 48A, which may be found at electronically. On March 31, 2023, the Division of Property Management and Construction (DPMC) will electronically randomly select from an appropriate pool of its pre-qualified consultants, a short list of firms who will be invited to submit a Technical and Fee Proposal for the project. The initial Construction Cost Estimate (CCE) for this project is $840,000 The Current Working Estimate (CWE) for this project is $ 1,357,800

Conceptual

Jails / Prisons

$840,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
111
Bidding Soon
1,616
All Active Projects
770
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2023

March 3, 2025

img_map_placeholder

4293 NJ-47, Maurice River, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Touch Screen Control Station, Locking System Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.