BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Merced, California. Completed plans call for site work for a bridge / tunnel.

PN- 10120003161 WORKING DAYS: 450 In Merced County At Various Locations The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority of the work: C-8, C-12. The Project will seismically retrofit five bridges on State Routes 59, 140, and 152 in Merced County to increase their structural integrity. The construction activities include retrofitting hinges with pipe seat extenders and cable restrainers, adding steel column casings, and upgrading non-standard bridge railing In channel work is expected for the Bear Creek Bridge, Los Banos Creek Bridge, and the San Joaquin River Bridge. These three bridges will require dewatering and the installation of temporary water diversions to allow for work within the channel. The diversion at the Bear Creek Bridge will consist of gravel bag berm with an impervious membrane. Approximately 0.54 acre of channel will be dewatered on the north side and south side of the bridge. Flow will be allowed to continue through the center of the channel. The diversion at the Los Banos Creek Bridge will consist of a gravel bag berm with a culvert pipe directing flow of the creek. Approximately 1.06 acre of channel will be dewatered. The diversion at the San Joaquin River Bridge will consist of a gravel bag berm with a culvert pipe directing flow of the river. Approximately 1 acre of channel will be dewatered. In channel work is not anticipated for the San Joaquin River (Santa Rita) Bridge as all work can be done from the bridge deck. However, since the San Joaquin River is considered a navigable water of the United States, the work requires authorization from the Corps under Section 10 of the Rivers and Harbors Act of 1899. Therefore, the work on the San Joaquin River (Santa Rita) Bridge is covered under this Order. In channel work is not anticipated for the Eastside Bypass Channel Bridge and will not require a federal license or permit. Therefore, the work on this bridge is not covered under this Order.

Award

Bridges / Tunnels

$11,485,714.00

Public - State/Provincial

Site Work

203

13

35

6

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
26
Bidding Soon
626
All Active Projects
307
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2023

August 14, 2023

img_map_placeholder

Multiple Locations, Merced, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.