Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 21, 2023 at 8:00 PM
Updated July 31, 2024
Site work for a water / sewer project in St Clr Shores, Michigan. Completed plans call for site work for a water / sewer project.
Reference Number 0000317575 Question Deadline 05/25/2023 at 2:00 PM ET Questions are submitted online No Rehabilitation of an existing RTB/CSO outfall including sheeting, excavation, new outfall structure, and other appurtenances. General Requirements - Insurance Required - License Required - Local Service Required - Prevailing Wage Required Contact Information Steven Wagner 586-469-6134 steven.wagner@macombgov.org The Chapaton RTB Canal Rehabilitation Project includes the following major work items: - Site clearing, excavation, haul out, and installation of sheet pile to expand the Chapaton RTB Canal. - Installation of a 6-foot-high precast concrete screen wall. - Construction of a new canal gate structure with new control building and associated appurtenances. - Construction of a concrete bypass box culvert with slide gate and stop logs. - Furnish and installation of new weir gates, slide gates, valves, piping, and associated electrical and instrumentation. - Demolition of existing gate structure and control building. - New concrete screening structure at the Chapaton RTB outfall. - New flushing gates installed in the Chapaton RTB Basin easterly weir wall. - 9 Mile Road sewer separation and road replacement. - Site restoration and landscaping. CONTRACTOR shall submit plan to ENGINEER for approval, prior to beginning Work, for maintaining service of the existing gate structure and existing gate control building and Chapaton RTB and facilities in accordance with construction project constraints detailed in Part 3 - Execution - 3.01 Project Constraints. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Wade Trim Associates, Inc. - John Arvai -Senior Vice President- jarvai@wadetrim.com
Post-Bid
Water / Sewer
$1,000,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2023
July 31, 2023
To Be Determined, St Clr Shores, MI
Related To This Project
St Clr Shores, MI
Bid Date: May 16 2023
St Clr Shores, MI
Bid Date: May 31 2023
St Clr Shores, MI
Bid Date: May 23 2023
St Clr Shores, MI
Bid Date: May 16 2023
St Clr Shores, MI
Bid Date: May 23 2023
St Clr Shores, MI
Bid Date: May 16 2023
St Clr Shores, MI
Bid Date: May 16 2023
St Clr Shores, MI
Bid Date: May 16 2023
St Clr Shores, MI
Bid Date: Mar 28 2023
St Clr Shores, MI
--
St Clr Shores, MI
Bid Date: Mar 31 2023
St Clr Shores, MI
Bid Date: Feb 16 2021
St Clr Shores, MI
Bid Date: Apr 04 2023
St Clr Shores, MI
Bid Date: Apr 11 2023
St Clr Shores, MI
Bid Date: Apr 11 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
